closed #185526
Trails
1004 W Country Club DR
- Case Date:
- 9/11/2023
no warning for pedestrians and cyclists at road construction over multipath.
no warning for pedestrians and cyclists at road construction over multipath.
Guardrail over B-line at 10th and N. Monroe has been left damaged after auto accident for 2 years. Abandoned bikes, grocery carts, bags of trash and camps are all collecting above trail. Cars speed up the road and it’s just a matter of time before another accident and the car goes onto the trail and injures somebody. Please fix the rail and cleanup. This has been reported and ignored ever since the accident. The debris left from the accident was cleared and cleaned by the neighborhood community. A sincere effort from the appropriate city departments to resolve this issue would be appreciated. We’re doing our part please do yours.
trail needs to be trimmed back
Side path along South Sare from Rohrer to Canada dr (?) is very over grown. Trail has been reduced to less than 3 feet in some areas. Impossible to safely walk, run or ride past others in same direction or opposite. This trail was put on a "bush hog list" but hasnt seen any bush hogging. Even once it is done, this trail and others need more than a once a year clearing.
The Polly Grimshaw Trail has shrubbery/trees over hanging such that one has to duck (at least) to avoid the branches while biking. This is especially a problem as it effectively makes the bike path one way in some locations. Please trim the branches to increase safety along the trail. Also, there is poisonous hemlock along the trail. It woudl be great to remediate that section of trail. Thanks!
still a hazard on the Polly Grimshaw bike path
Isn’t it interesting how all the complaints about the south High street trail clearing are closed, without resolution, mere hours after being logged? AND YET nothing has been done! WE have to clean up this mess ourselves. Thanks, Hamllton for your lies.
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!
Polly Grimshaw Trail, east section, needs a trim, especially the west end near Pete Ellis Dr. Workers should be careful of the large growth of poison hemlock!
The trail on the north side of Winslow from Allendale to Abby Ln has trees and other greenery hanging down and into the trail, so you end up having to walk through the grass.