uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (26)

closed #187225

Sewer Problems (Storm Sewers)

1000 S Ballantine RD

Case Date:
2/7/2024

Storm drain casement junction is clogged with branches. You can see it through the heavy iron grid on the drain at the SW corner of Southdowns and Ballantine. It will require lifting the grid cover the clear out.

closed #180393

Sewer Problems (Storm Sewers)

Case Date:
6/22/2022

A couple of months ago the city started installing new stormwater pipes on E Saratoga Dr. The project appears to have been abandoned mid-way through. One side of the street remains dug up and very loosely covered with gravel. Construction equipment has never been moved. Is there a timeline for finishing the project and restoring the road?

closed #184065

Sewer Problems (Storm Sewers)

Case Date:
6/1/2023

Clogged sewer drain. Second Request

closed #184526

Sewer Problems (Storm Sewers)

Case Date:
7/9/2023

All of the storm sewers along Hillside De that I ran past this morning between Moores Pike and Henderson were very clogged with debris and mud. You could barely see where they were besides the excess sticks, leaves, and mud buildup. Often times our neighborhood drains (Sycamore Knolls) are similar after a big storm.

closed #185960

Sewer Problems (Storm Sewers)

Case Date:
10/13/2023

The storm grate in the 300 block of 7th street is broken and the structural integrity of the drain appears to be somewhat compromised. The concreate around the drain is severely damaged. This is a fairly new drain so I'm a bit surprised that it has broken so quickly.

closed #188955

Sewer Problems (Storm Sewers)

Case Date:
6/14/2024

The storm drains on both the North and South side of Heather are always full of debris. When it rains, there is very little area for the drainage. Please clear the debris.