Sewer Problems (Storm Sewers)
115 W Grimes LN
- Case Date:
- 4/25/2023
The creek is covered in waste that looks like lint. It has been collecting over the past few weeks. There is a drainage pipe at the bridge that looks like the source. The creek bed surface is completely covered.
Sewer Problems (Storm Sewers)
242 S College Ave, Bloomington, IN 47404, USA
- Case Date:
- 6/26/2023
Storm drain clogged up 3rd st and bline
Westbound lane
Sewer Problems (Storm Sewers)
1301 W Allen ST
- Case Date:
- 7/5/2023
I am a resident here and they are building a new development, however there is no effort to keep run off from coming from the construction drive (our driveway is often covered in mud, gravel, and concrete run-off). It has gotten so out of control that there is literally a pile of concrete run-off on a sidewalk going down Allen St towards the neighboring apartment complex (Gardens Edge). They also have concrete run-off going into our yard space in the complex where many people take their dogs and children to enjoy the outdoors.
Sewer Problems (Storm Sewers)
- Case Date:
- 7/9/2023
All of the storm sewers along Hillside De that I ran past this morning between Moores Pike and Henderson were very clogged with debris and mud. You could barely see where they were besides the excess sticks, leaves, and mud buildup. Often times our neighborhood drains (Sycamore Knolls) are similar after a big storm.
Sewer Problems (Storm Sewers)
1220 E Allendale DR
- Case Date:
- 7/13/2023
Constant water source seeming to come up from the road or sidewalk on the southeast corner of Bainbridge and Allendale.
Sewer Problems (Storm Sewers)
- Case Date:
- 6/1/2023
Clogged sewer drain. Second Request
Sewer Problems (Storm Sewers)
E Allendale Dr & S Bainbridge Dr, Bloomington, IN 47401, USA
- Case Date:
- 8/5/2023
Water coming up from this area is staying on the street drainage. It seems to be worse since the crews recently came through to install fiber. I see multiple reports on this issue have been made but there's water there now that could be tested.
Sewer Problems (Storm Sewers)
451 N Pete Ellis Dr, Bloomington, IN 47408, USA
- Case Date:
- 8/9/2023
Wednesday, August 9
The catch basin on the west side of the street just north of where the Indiana Rail Road crosses Pete Ellis Drive seems to be plugged somewhere underneath the road. Debris doesn’t pile up on the grate the way it used to, and the large puddle I observed after this afternoon’s thunderstorm was draining only slowly. Again, an accumulation of debris was not the problem.
approximate address: 451 N Pete Ellis Dr, Bloomington, IN 47408, USA
Sewer Problems (Storm Sewers)
- Case Date:
- 6/19/2021
I checked and cleared storm drains on Sussex and Queensway yesterday afternoon and removed debris, except those two near High St that have filters to prevent construction from the new "trail". This morning with the help of a neighbor cleared the Sussex drains. I then cleared those on Queensway.
The problems of separation of the present layer of pavement on Queensway and knowing there was a potential of heavy rain from the present on later storms today. I piled a significant amount of loose pavement with the debris at the south drains at the intersection of Queens Way and Chelsia Court. incase of heavy rain today.
Also all three of these drains have a significant amount of eroded pavement below the drain's grates. Thus these debris may in the future become plugg the storm drain.that goes down just past Sussex Dr and result in potential stormwater flash flooding as in June of 2007 that damaged my neighbors property.
Sewer Problems (Storm Sewers)
728 W Allen ST
- Case Date:
- 9/6/2022
Debris has clogged up the ditch along the street.