Utilities Construction
Spicewood Ln
- Case Date:
- 7/3/2024
There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.
Utilities Construction
812 S Park AVE
- Case Date:
- 7/5/2024
The cover of our water meter on the sidewalk is loose and poses a risk for tripping, strollers, wheelchairs etc
Utilities Construction
812 S Park AVE
- Case Date:
- 7/5/2024
The cover of our water meter on the sidewalk is loose and poses a risk for tripping, strollers, wheelchairs etc
Utilities Construction
5942 Handy Ridge Road
- Case Date:
- 6/12/2013
Hi, I have noticed that the landscapers have been down on Shields Ridge to fix yards and put down grass seed. I need to have my yard fixed. I sent in a report a few months ago, and grass seed and straw was put down. But there are still areas of gravel and the yard is uneven from trucks being parked there. Thanks
Utilities Construction
5890-5898 Handy Ridge Road
- Case Date:
- 2/14/2013
I live on Handy Road and a few months ago after the pipe crew was well past our house and started to put down grass seed and straw I noticed that they seemed to have missed my yard and the neighbors. There are a few spots of gravel that need to be cleaned up also. I was wondering who to contact to get grass and straw before any heavy rains turn this into mud and wash way. Thanks My address is 5942 S. Handy
Utilities Construction
2700 N Blue Ridge CT
- Case Date:
- 5/21/2013
On Friday May 17 white flags were placed on both sides of our street - Blue Ridge Drive. Is there some type of work planned for this area? Thanks,
Karen Watkins
Utilities Construction
2610 Round Hill Ln
- Case Date:
- 7/5/2024
Could the city please finish the water project started during the winter? I scrap my car every time I come out of my driveway. The patch jobs were terrible on all parts of the Spicewood neighborhood.
Utilities Construction
1415 E Hunter AVE
- Case Date:
- 8/4/2024
Fiber install hit water line. Lots of water leaking
Utilities Construction
1409 S Park AVE
- Case Date:
- 8/2/2024
Fiber contractor hit house sewer line—sewer is now backed up.
Utilities Construction
1210 1/2 S Walnut ST
- Case Date:
- 6/26/2018
Hello,
There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well.
As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street).
Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue.
Sincerely,
Brandon Fricke