Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Utilities Construction
700 E Winslow Farm DR
- Case Date:
- 11/5/2013
says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.
Utilities Construction
7046 S Shields Ridge RD
- Case Date:
- 9/4/2013
Resident (Shawn Waylen?) at 7046 S. Shields Ridge Rd. reports that repairs are needed to yard and driveway. The new 36" water transmission pipeline was installed in this area.