Search Results: (109)

open #179640

Utilities Construction

3147 S Coppertree DR

Case Date:
4/25/2022

In the street adjacent to 3152 s Coppertree , a cover is half missing

open #182111

Utilities Construction

Bloomington, IN, USA

Case Date:
11/19/2022

It is sinking and needs cleaned.

open #182248

Utilities Construction

1205 S Collinswood DR

Case Date:
12/10/2022

My water is off. There has been work in the area, but no communication about it. No work occurring today. I am quite disturbed that it appears I might be without water for a while with no information about it.

open #182511

Utilities Construction

1020 S Woodlawn Ave, Bloomington, IN 47401, USA

Case Date:
1/17/2023

From Reddit Bloomington: Fiber cables damaging sewer lines We live right next to Bryan Park. About a week ago our toilet backed up, and after multiple visits from our (very honest and reasonable) plumber, we discovered that the city's fiber optic internet contractor had carelessly run an optic cable directly through our sewer line. This caused a ton of debris to get into our drain pipe and completely clog the pipe, necessitating a $10k repair. I called the city and apparently, this is happening to people all over town. (The person in the utilities office said I was the third person to call today with this exact problem, and our plumber said that this contractor got thrown out of Carmel for damaging so many sewer lines).

open #185582

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
9/14/2023

Gigabit or AES or their contractors are installing fiber optic cable or something such as that. Will they be repairing all the grass from the holes and tracks from the heavy equipment?

open #185872

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
10/4/2023

Gigabit or Giga-something installed fiber optics in the neighborhood. The holes they dug in the grass were not repaired. After advising them of the situation they came out to "repair" the grass. The soil was filled with rocks and gravel. There were no grass seeds in the soil. I spent a whole day picking rocks and gravel out of the soil, buying top soil, and grassseed to fix this. The ground is no longer level and there's also rather gouges or chunks in sidewalks and curbs. The road had preexisting, but plugged pot holes near the Sare entrance, but now those potholes are open again and expanding.

open #186193

Utilities Construction

Case Date:
11/2/2023

The folks installing the fiber optic have severed what seems to be the main water line on the North side of Etter Drive, at about 6:30 pm, Thursday Nov 2. Water is gushing above the street, and beginning to flood lots.

open #186495

Utilities Construction

Case Date:
12/12/2023

Water main break at w 17th st by storage units. Looks like fiber installation caused it. Will they be fined for this?

closed #164968

Utilities Construction

1210 1/2 S Walnut ST

Case Date:
6/26/2018

Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke

closed #165945

Utilities Construction

1607 S Andrew CIR

Case Date:
9/17/2018

Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.