closed #165945

Utilities Construction

1607 S Andrew CIR

Case Date:
9/17/2018

Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.

closed #166964

Utilities Construction

1600 S Nancy ST

Case Date:
1/4/2019

Smart water meters

closed #155746

Utilities Construction

6000 S Handy RD

Case Date:
8/29/2013

On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.

closed #137153

Utilities Construction

2965 S Pinewood LN

Case Date:
4/8/2014

Customer said that CBU did sewer line work in back of her home and now her toilet and bathtub are leaking.

closed #168113

Utilities Construction

1115 E Ridgemont CT

Case Date:
4/15/2019

Highland and Skylark-Water coming out of the street, crews digging and trying to repair, water shut off at 1527 S. Highland Ave. Would love to know how/if this will effect our water.

closed #171952

Utilities Construction

511 W Pargrave PL

Case Date:
3/9/2020

Hole in utility lid with no meter. All other lids on this street have smart meters so I just want to make sure this one wasn’t vandalized

closed #172192

Utilities Construction

600 E Moody DR

Case Date:
4/9/2020

Three very large pipes have been lying in my yard for over one week now. I believe that this is for a contracted public works project. I do not want to approach the workers during this public health crisis as they are not wearing face masks. I would like to be able to mow my lawn this weekend, and I do not feel that the lawn of an occupied house is the appropriate place to store construction equipment. I would like to request that the workers are instructed to remove the pipes from my lawn either today (Thursday, April 09, 2020) or tomorrow. In the event that this is not a water-related project, I would assume the city has permits on file to communicate with the appropriate party.

closed #174454

Utilities Construction

320 S Maple ST

Case Date:
1/7/2021

Water meter covering busted. Looks like the ureport photo issue still hasn’t been fixed so email me for the photo

open #177881

Utilities Construction

2210 E Ashwood CIR

Case Date:
10/14/2021

I am the homeowner and have recently built an attached sunroom with sinks at this address. I need to connect the water pipe from those sinks to the city sewer line, and so would like to request a detailed sewer line map of/around my property, if available. Thanks.

closed #178891

Utilities Construction

3425 S Cedarwood CIR

Case Date:
2/8/2022

This is more of a question after some recent work done by my property to fix a water main leak. As you can see from the image, there is some damage done to the lawn by heavy equipment used during the process. I was wondering if the city is going to help fix some of that or whether the responsibility lies on me. Also, is there any plan to re-pave part of the street that was drilled through to fix the underground water leak? Guessing yes once it is warmer outside? Thanks!