uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (36)

closed #165317

Biking & Walking

201 W 17th ST

Case Date:
7/28/2018

The green painted "bike box" and bike lane entering it are full of gravel and debris. It on the east bound lane of 7th Street just west of College - at the light for 7th.

closed #165470

Biking & Walking

Case Date:
8/13/2018

The pedestrian crosswalk signals at S. Walnut Street and E. Miller Drive do not work. It is impossible to cross at this point without these functioning.

closed #165474

Biking & Walking

Case Date:
8/13/2018

Walk sign only partially functional Location: SW Corner of College Ave and 6th (social cantina) The walk sign facing across 6th (towards jewelry store) isn't displaying the walk icon with the white bulbs. The orange bulbs do work and show the stop hand and the countdown when it's time.

closed #165747

Biking & Walking

Case Date:
8/30/2018

Hi, Please clean the bike lane from College Ave and the bypass heading south. Also, 446 shoulders from 3rd St all the way south to Highway 50 could use some clean up. And Fairfax rd shoulders need some work as well. Thank you, Joan Ellis

closed #166264

Biking & Walking

Case Date:
10/19/2018

Hello. I reported 165371. I noticed there were thin paint lines now, almost like precursors to new crosswalk paint? Will new thicker lines be painted soon? Thank you!

closed #159882

Biking & Walking

Case Date:
6/27/2017

this morning i was walking downtown. i was crossing from the "chase bank" corner to the "the tap" corner & the device that is supposed to indicate walk or wait isn't working. the screen was just black.

closed #161083

Biking & Walking

900-998 North Fess Avenue

Case Date:
9/10/2017

Fess is a good bike route, but the pavement in this area is so deteriorated that it is dangerous. This is especially true under the railroad overpass because the sudden change from light to shadow makes it almost impossible to see the defects in the pavement.

closed #161118

Biking & Walking

1002-1014 East Southdowns Drive

Case Date:
9/12/2017

Just past Woodlawn in the Southdowns bicycle/pedestrian lane the is a ~10x3 foot asphalt patch probably covering some utility work. The north side of has opened a 2 inch gap in which grass is growing. This makes 10 foot long slot and the front wheel of my bike got caught in the slot causing me to fall this morning. I was not injured but this slot is a clear hazard.

closed #161333

Biking & Walking

Case Date:
9/27/2017

Not new Lane but requesting bike symbols painted again soon in Park Ridge East to make folks aware and slow down. Great new surface but don't want a highway!! Is residential.

closed #163550

Biking & Walking

1415 E 3rd ST

Case Date:
3/14/2018

I think it is now more than three years since there have been proper crosswalks for pedestrians crossing Third Street at the Jordan Avenue intersection. It is more than two years since the first time I wrote to inquire about it (March 2016). I was told then that it would be done in the summer of 2016. I wrote again in early 2017, and was told it would be done in the spring of 2017. A friend of mine wrote in the summer of 2017 and was told it would be done in the fall. What the heck is going on? After the recent work at Third and Woodscrest, new crosswalks appeared immediately. For it to take years at a corner where the pedestrian traffic is much higher seems truly unconscionable.