- Case Date:
- 5/12/2023
The Hunter footpath (maintained by the city) between Eastside Drive and Mitchell is starting to get flooded again by a spring that has resurfaced.If nothing is done, it will become a breeding place for mosquitoes in the summer and an icy path in the winter.
Biking & Walking
1419 S Sare RD
- Case Date:
- 5/19/2023
The side path along the west side of South Sare from E Moores Pike to E Cathcart is about half blocked at multiple points by trees and shrubs. Have seen people step into roadway to avoid other path users.
Biking & Walking
1715 S Walnut St, Bloomington, IN 47401, USA
- Case Date:
- 5/30/2023
There is a pedestrian activated crossing from the Switchyard park over to the B-Link Trail on South Walnut. Activating the signal triggers a red light for traffic on South Walnut, but I constantly have issues here with traffic blowing through the red light, often at high speeds.
Is there anything that can be done to make this crossing safer for pedestrians and cyclists?
Biking & Walking
Bryan Park North Shelter, 909 S Fess Ave, Bloomington, IN 47401, USA
- Case Date:
- 6/20/2023
Broken glass on path through park
- Case Date:
- 7/5/2023
Can someone inspect the state of the footbridge along E Second Street, especially the part closest to Rose? The railing has started to sag. I just do not want it to collapse with someone on the bridge.
- Case Date:
- 7/22/2023
The metal drain cover in front of Mother Bear's at 1428 E Third Street has fallen in (again). It clearly is not stable and one day someone may trip over it.
Biking & Walking
300 N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 7/26/2023
Please, would you replace the flexi-post on the 7-Line on the east side of Walnut next to La Una Cantina? The IU residential calendar has early arrivals starting August 2nd, so I think it would be a good idea to get it replaced before then. Thank you!
Biking & Walking
923 N College AVE
- Case Date:
- 7/28/2023
Hello,
The bike lane on N College is covered in gravel and debris. Under the rail bridge north of 12th St, I am forced to bike in the far right lane of traffic due to the debris.
I understand that there is a project on this area, and I sincerely hope that protected bike lanes are installed to create less stressful trips downtown.
- Case Date:
- 8/4/2023
FYI, the only person complaining so far about speed bumps on the PRE greenway plans can easily have ZERO humps by taking Park Ridge Road home at minimally increased distance, or maximum ONE if taking Morningside.
- Case Date:
- 8/10/2023
Why haven’t you installed pedestrian crossing lines and signals yet? You’ve known about this for so long. I was nearly hit crossing with the light on foot just today. Cars in every direction had to adjust to seeing a pedestrian crossing, they all wanted to drive where I was crossing. Do something now! Tens of thousand of students are coming, always dangerous for pedestrians. Someone will get hurt with students never looking for people on foot when they’re trying to figure out where they’re going, turning, beating yellow lights, turning on red, etc. PLEASE!