closed #185701
Biking & Walking
1120 N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 9/21/2023
There are sudden piles of gravel in the bike lane and debris in the drains. This is very dangerous for bike users
There are sudden piles of gravel in the bike lane and debris in the drains. This is very dangerous for bike users
The pedestrian light to cross third street often doesn't work and it becomes impossible to cross the street at the intersection.
Glass in the bike lane on E. Longview Ave. near the corner of E. Longview and Pete Ellis Dr.
The pavement in the northbound lane of Eagleson just south of the Eagleson/3rd Street intersection is slanted, bumpy, and uneven, and almost caused me to wreck my bicycle in front of oncoming traffic. Are there plans in the works to repair the sinking/uneven portion of the roadway? Thank you. (The pavement on Eagleson between Hunter and Atwater is also sinking, but I can avoid that by riding my bicycle in the left lane.)
Audible crosswalk button is not working at SW corner of 3rd and Walnut, in front of county early voting location.
There is significant debris – sand and gravel – strewn across the bicycle lane in several places on North College Avenue. The debris has been there for MONTHS. The debris is very hazardous to bicyclists, especially because it is so thick and extensive. Bicyclists avoiding the debris or sliding on the debris could be struck and killed by motor vehicles – especially given that the City utterly fails to enforce the speed limit, which means that drivers have less time to react. The area with these piles of debris extends for almost the entire length of Miller Showers Park.
Hello, The bike lane on N College is covered in gravel and debris. Under the rail bridge north of 12th St, I am forced to bike in the far right lane of traffic due to the debris. I understand that there is a project on this area, and I sincerely hope that protected bike lanes are installed to create less stressful trips downtown.
Please, would you replace the flexi-post on the 7-Line on the east side of Walnut next to La Una Cantina? The IU residential calendar has early arrivals starting August 2nd, so I think it would be a good idea to get it replaced before then. Thank you!
Can someone inspect the state of the footbridge along E Second Street, especially the part closest to Rose? The railing has started to sag. I just do not want it to collapse with someone on the bridge.
The side path along the west side of South Sare from E Moores Pike to E Cathcart is about half blocked at multiple points by trees and shrubs. Have seen people step into roadway to avoid other path users.