Sidewalk Requests
102 E Ridgeview DR
- Case Date:
- 11/30/2021
There is a need for sidewalk on the east side of S Walnut street between E Winslow Rd and E Ridgeview Dr. It's a very dangerous stretch where motorists tend to speed and includes a blind hill. There are pedestrians walking along the shoulder of this road constantly. Thank you for your time.
Sidewalk Requests
1101 S Henderson ST
- Case Date:
- 8/21/2016
Owner has set up a drain from the basement of this house that dumps directly on the sidewalk in front of the house. The sidewalk has been a muddy mess of standing water and a fall hazard ever since. Is this a violation of city code? It seems like it would break down the side walk over time and ,again, be a fall hazard due to the muddy mess.
Sidewalk Requests
1207 E Wylie ST
- Case Date:
- 8/9/2014
sidewalk and curbs are cracked and buckled.
Sidewalk Requests
1215 W East Branch RD
- Case Date:
- 1/9/2017
Please install sidewalk connecting existing sidewalk and the road on the corner, crossing Branch.
Sidewalk Requests
1321 S Washington ST
- Case Date:
- 5/15/2024
The sidewalk is covered in mud and becomes hazardous when wet.
Sidewalk Requests
1365 S Stella DR
- Case Date:
- 5/27/2023
Sidewalk on Smith is being encroached upon by undergrowth
Sidewalk Requests
1609 S Rogers ST
- Case Date:
- 1/18/2024
I would love to see a proper crosswalk and sidewalks added at all sides of the Rogers and Rockport intersection. I would also like to request a completed sidewalk added to the east side of Rogers between Rockport and the Switchyard Park entrance. Families from Rockport Hills and the surrounding neighborhoods often walk over to Switchyard Park and I personally have had and witnessed numerous close calls attempting to cross Rogers to enter Switchyard Park on foot. It would be great to have some sort of crosswalk added at the Switchyard entrance to aid those on foot trying to cross Rogers and enter the park. During larger events when the park parking lot fills up, there is overflow parking in the field in front of Catalent. Then a huge flow of people are forced to wait for traffic in order to essentially jaywalk into the park. It seems to me that some infrastructure improvements are needed for this area of Rogers St. to facilitate the main entrance to one of the largest parks in the city. Finally, I think it would be great to have some sort of high retaining wall built around the massive eye-sore electrical transfer station directly across from the park entrance (similar to the one built right next to the Upland Woodshop). Thank you for your time and consideration!
Sidewalk Requests
1708 E Ruby LN
- Case Date:
- 3/4/2019
We would like to expand our driveway, but that would involve changing the curb and sidewalk around our current driveway. Who do I talk to about this?
Sidewalk Requests
1901 E Ruby LN
- Case Date:
- 9/13/2023
There is one block of Ruby Ln (my block) with no sidewalk. Please consider converting the huge culvert that runs along the S side of Ruby from Nancy to High into a storm drain, and putting a sidewalk over the drain.
Sidewalk Requests
1935 E 2nd ST
- Case Date:
- 8/12/2022
Will the improvements to E 2nd Street include installing sidewalk to fill the gap between 1935 E 2nd and 2000 E 2nd Street? This gap is a barrier to accessibility for pedestrians on this street.