closed #139915
Sidewalk Requests
1207 E Wylie ST
- Case Date:
- 8/9/2014
sidewalk and curbs are cracked and buckled.
sidewalk and curbs are cracked and buckled.
The ground near the cablebox is sunken which caused the other end of the section to raise up. The section affected crosses properties of 3313 S Southern Oaks Dr and 3307 S Southern Oaks Dr
The curb at the end of my driveway has crumbled and large chunks of cement are blocking drainage, curb needs to be redone at end of driveway at 1737 E. Camby Lane
Why was a ramp not installed on this brand new sidewalk?!?
Resident expresses concerns about lack of sidewalks near senior housing facilities on Walnut Street Pike near Rhorer Road, would like to speak with a staff member about potential installation of a new sidewalk.
Good news: curb cuts being added on E Covenanter! Bad news: desperately needing oversight and quality control. This curb cut FAILS several accessibilty standards.
WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???
Hi. I live at 1418 S Palmer Ave. We are supposed to be able to park on the street in front of our house. However, the gravel has washed away and left a ditch that is impossible to park in (towards the far end in the photo). The result is that, when we park here, our cars are sticking out into the street more than they should be. Last week, my roommate's car was hit while parked here, which could in part be caused by this issue with the street parking area eroding. We are hoping that the City can come fill it with gravel or pave it so that we can park here without worrying about our cars sticking out into the street and getting hit. Thank you, Hannah
Anyone wishing to walk the full length of Smith is forced to cross the road at least once, more depending on starting location. The road is fast (despite the speed limit), with no pedestrian crossings, and several blind summits
Will the improvements to E 2nd Street include installing sidewalk to fill the gap between 1935 E 2nd and 2000 E 2nd Street? This gap is a barrier to accessibility for pedestrians on this street.