- Case Date:
- 7/15/2020
Co-live site, college & 14th. When i checked on monday, if i remember correctly, the barrier between the walkaround and college was contiguous...this driveway was blocked by the jersey barriers. Now the barriers have been moved to partially obstruct the walkaround and to open the driveway up. I have no idea, is this change approved,is this the agreed-upon access point for this site? Sorry to waste your time if this is actually correct. Thanks!
- Case Date:
- 7/13/2020
between 518 and 525 e. first, vegetation obstructs sidewalk
- Case Date:
- 7/1/2020
317 e. grant St., vegetation encroaching sidewalk
- Case Date:
- 6/6/2020
Sidewalk blocked with construction sign on north side of 17th between woodburn and kinser. In front of 314 W 17th. I believe its trying to warn about sidewalk closure for site just west of kinser. The sidewalk here is still useful to connect to sidewalks on the east side of madison and kinser, and it should not be blocked. A desire trail in the grass indicates there are pedestrians still using this route.
- Case Date:
- 6/6/2020
Sidewalk blocked with construction sign on north side of 17th between woodburn and kinser. In front of 314 W 17th. I believe its trying to warn about sidewalk closure for site just west of kinser. The sidewalk here is still useful to connect to sidewalks on the east side of madison and kinser, and it should not be blocked. A desire trail in the grass indicates there are pedestrians still using this route.
- Case Date:
- 5/31/2020
SE corner of 14th&college. Co-live. They scraped the mud off the sidewalk! Sand and trailer hitch remain.
- Case Date:
- 5/29/2020
SE corner college&14th. Co-live. Loading across the sidewalk, not at the driveway. Past partial obstructions still present.
- Case Date:
- 5/22/2020
Southeast corner of college and 14th. Co-live site. A lot going on here today. Sand is unmitigated, erosion control still breached. I took a picture at 9:52 and it showed a lot of activity on the sidewalk so I came back at 10:58 to see if that activity was temporary. It appears by the presence of the hose, which was present an hour ago, that they are using the sidewalk as part of their work process to mix mortar. Workers in the fire background (near the bridge) appear to be preparing to tear up the sidewalk to bury a pipe. I understand there will be impacts from construction, but if they were going to block the road they would at least install a temporary detour of some kind.
- Case Date:
- 5/18/2020
Southeast corner of college and 14th. Old mancino's construction site. Construction equipment has moved but supplies (sand, sheet board) remain. Sidewalk partially obstructed. Workers appeared to be working inside the building.
- Case Date:
- 5/17/2020
Southeast corner of college and 15th. Construction site at old mancino's. construction equipment and supplies blocking sidewalk. No change since Friday.
Sorry to bother you again just making a paper trail still.