closed #187883
Blocked Sidewalk
W 3rd St & S Madison St, Bloomington, IN 47404, USA
- Case Date:
- 4/4/2024
Bush is overgrowing into the road and sidewalk
Bush is overgrowing into the road and sidewalk
Sidewalk blocked by fiber truck. Workers told me they did not have to put up signs and barricades and proceeded to yell at me
Southern sidewalk on 17th blocked by fiber contractor with no signs or barricades present
The multiuse path on the west side of Sare Rd from Rogers to David has numerous locations where the vegetation blocks the complete use of the path. The problem is most severe at the south end but there are other places up to Moore's Pike with similar issues.
Sidewalks on west side of Sare Rd are becoming very challenging to use. Trees and bushes have encroached the point of having to step of sidewalk. In other areas the width has been reduced to half.
Within the Bentley Court neighborhood the city street and sidewalks are blocked by overhanging trees. It is mostly in the middle of the neighborhood along Abby Lane. By the post office boxes and across the street. You can't miss it. You might want to drive around the small neighborhood a bit to see other spots where the sidewalks are blocked. Probably a 30 min job at most. Thanks so much. The main entrance island with three trees are fine...they were trimmed last Fall.
protestors are encircling the sidewalk with a piano
Vegetation needs to be cut back as it forces pedestrians to walk in a busy street. This issue was raised last summer and was ignored. Thanks
Limb down on sidewalk and a tiny bit into the street, just west of the intersection of Indiana Ave and 6th St, on the north sidewalk.
Hello! The path for students to walk to/from school is not safe. The crossguard cannot help students cross at High and Greenbriar AND navigate around the closed sidewalk. The gravel/dirt path needs to be completed ASAP so students, parents, staff, and other residents can walk safely. My assumption is that path cannot be complete until the electrical lines in front of 2102 High Street are relocated. If this is the case, please let me know who I can contact about relocating the electrical lines so the path can be paved and this project can be wrapped up. We were told the path would be complete by the start of the school year and are becoming increasingly frustrated with the unsafe environment.