open #189073

Utility Construction Projects

1501 S Highland AVE

Case Date:
6/24/2024

Utility contractor is using rebar rods for safety fencing around open holes along side walk but they are not using rebar caps on top of the rebar which poses an impailment hazard if someone was to fall into the rebar.

closed #188784

Utility Construction Projects

City Water Tank, Bloomington, IN 47408, USA

Case Date:
6/5/2024

Original Case # 187132. Hopefully you can see the photo this time. I talked to someone from the city at the Earth Day event at Switchyard Park, but still haven't heard or seen any changes.

closed #188676

Utility Construction Projects

509 N Grant ST

Case Date:
5/30/2024

There are a lot of rocks on the edges of the road on both sides in this block. Looks like they are from a recent construction project that was not cleaned up afterwards, and they look like they are too big for the street-cleaning machines to pick up.

closed #188256

Utility Construction Projects

806 S Woodlawn AVE

Case Date:
5/3/2024

The portion of my property with a utilities right of way and that I am maintain is now blocked in a hazardous way. I open my gate as of yesterday May 2, 2024 to a deep 2-3 foot hole that now has 2 large pipes sticking up above ground level constituting a direct hazard to my rightful access. The company (Flagship Underground-phone: 773-964-9045) claims to be laying fiberoptic cable and said they were trying to locate the sewer and gas lines. What can you do to have these pipes moved and/or buried so that they not blocking my gate and presenting a tripping and access hazard? Thank you, Martha Nyikos

closed #187861

Utility Construction Projects

3890 S Claybridge DR

Case Date:
4/2/2024

Two sinkholes have formed, one at the corner of Claybridge Dr and Sare Rd, the other about 30 ft up the sidewalk on Claybridge, after recent neighborhood groundwork that had been done by the contractor for Bloomington Gigabit Now Fiber project. The sinkholes are a hazard to pedestrians and are in need of repair as soon as possible.

closed #187732

Utility Construction Projects

2217 E Autumn DR

Case Date:
3/20/2024

Lineal Contracting from Bedford is putting in underground utilities for something (AT&T I think) in our area and left a hole in my front yard (and my neighbors) and took off without filing it in. Haven’t seen them in over a week. I called them but they gave no answers and didn’t contact me when they said they would. All I (and my neighbor) request is they return to finish their work. A complete disrespect of private property. Can you help? Enough is enough with this!!

closed #186593

Utility Construction Projects

Case Date:
12/22/2023

do you know when road work done on old hospital

closed #184146

Utility Construction Projects

Case Date:
6/10/2023

The construction of under ground cable in our neighborhood is a disaster. It has been going on for months & the second gas leak on Thursday was not handled by the crew very well at all. The smell was terrible, the danger worse & no evacuation order was communicated. Our yards are a mess & cables have been sticking up in our yards since January with it seems no purpose. AEG & AT &T need to repair & leave our neighborhood.

closed #183231

Utility Construction Projects

2807 S Elizabeth CT

Case Date:
3/25/2023

Gas? Workers dug up multiple parts of my lawn and driveway. This was two weeks ago. They said they were going to come back and fix everything but obviously that hasn’t happened. In the dirt is ground pieces of the old driveway including baseball sized chunks. We are also selling the house so this is hiring our home value - no one wants to buy a house with a broken chunk of driveway.

closed #182863

Utility Construction Projects

3501 E Longview AVE

Case Date:
2/17/2023

The cover of one of the new boxes in the ground for the fiber optic cable is off. This makes a deep hole about 1.5 x 3 feet that a small child or dog could step into.