closed #186293

Utility Construction Projects

1130 S Madison ST

Case Date:
11/15/2023

There is a dangling guy wire at pole #152-572, located at the south end of Madison St. just north of Patterson/Grimes, at west edge of New Hope for Families property.

closed #188862

Utility Construction Projects

1430 S Weatherstone LN

Case Date:
6/10/2024

Shortly after driving on my street, where there is construction on traffic calming devices, I had a flat tire. There is a screw in it from where the construction crews have been working. We would like to know the process for getting reimbursement for repairs. We will have to replace the tire on a car we have had less than a month because of this. We also would ask that crews clean up the area and remove any hazards; there have been cones (and screws, apparently) in the way of traffic on South Weatherstone Lane. Thank you!

closed #181786

Utility Construction Projects

1450 W Lockview ST

Case Date:
10/11/2022

A private utility company cut a large hole in my driveway without permission. After removing that portion of my driveway they dug out what appears to be an area 3 feet deep and at least 2-3 feet wide just underneath my driveway. A piece of plywood was placed on top and is not secure. I’m not only afraid that someone will fall I. The hole, but also that an entire portion of my driveway will collapse into the ground. I have attempted to contact the private company (AT&T) and while they have opened a claim, I have yet to hear back from them in regards to this public safety concern and also how they plan to fix my driveway. My home sits on a very busy and trafficked corner in The Highlands. Lots of pets, small children, families walking all day. In addition, I can already see that area has shifted and sunk.

closed #189073

Utility Construction Projects

1501 S Highland AVE

Case Date:
6/24/2024

Utility contractor is using rebar rods for safety fencing around open holes along side walk but they are not using rebar caps on top of the rebar which poses an impailment hazard if someone was to fall into the rebar.

closed #182014

Utility Construction Projects

2104 S Azalea LN

Case Date:
11/7/2022

As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.

closed #181095

Utility Construction Projects

2200 E Moores Pike, Bloomington, IN 47401, USA

Case Date:
8/18/2022

AT&T lines need to be resupported. They were sagging and a truck snagged them. It broke a power pole that Duke replaced but the AT&T lines are just temporarily tied up. The whole line is a mess from High Street east with broken poles and sagging lines.

closed #187732

Utility Construction Projects

2217 E Autumn DR

Case Date:
3/20/2024

Lineal Contracting from Bedford is putting in underground utilities for something (AT&T I think) in our area and left a hole in my front yard (and my neighbors) and took off without filing it in. Haven’t seen them in over a week. I called them but they gave no answers and didn’t contact me when they said they would. All I (and my neighbor) request is they return to finish their work. A complete disrespect of private property. Can you help? Enough is enough with this!!

closed #183231

Utility Construction Projects

2807 S Elizabeth CT

Case Date:
3/25/2023

Gas? Workers dug up multiple parts of my lawn and driveway. This was two weeks ago. They said they were going to come back and fix everything but obviously that hasn’t happened. In the dirt is ground pieces of the old driveway including baseball sized chunks. We are also selling the house so this is hiring our home value - no one wants to buy a house with a broken chunk of driveway.

closed #183334

Utility Construction Projects

2807 S Elizabeth CT

Case Date:
4/4/2023

Gas utility dug up driveway and recently the new cement was put in but they left a large (heavy and immovable) clump on the lawn. Also the edge of the driveway is collecting water from the small ditch next to it they dug up. It’s been about a week now - I thought originally they might come back to take care of it.

closed #179861

Utility Construction Projects

316 E Cottage Grove AVE

Case Date:
5/14/2022

Att box knocke I Br