uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (80)

open #214701

Utility Construction Projects

110 E 12th ST

Case Date:
10/5/2026

Open utility access. Also, small opening in soil on SE corner, large enough to catch a foot.

closed #214640

Utility Construction Projects

108e E 6th St

Case Date:
10/1/2026

Powerline hanging off the pole and laying on the sidewalk and in the road

closed #214601

Utility Construction Projects

869 E Miller DR

Case Date:
9/30/2026

ATT just installed fiber for my neighbor. They tapped the power/utility line directly in front of my house to do so and strung a low hanging fiber line across my yard to the neighbors house. Its less than 15ft off the ground, dangles over a tree I just planted in my yard that will absolutely cause issues for the install (considering it doesn't get yanked out by a car driving under it). Please have them take this down before it causes an accident.

closed #214554

Utility Construction Projects

301 W 2nd ST

Case Date:
9/28/2026

Follow up to uReport #214330, 214331, 214332: Foam squares have been put into place, but they are not accessible due to large gaps between them.

open #214531

Utility Construction Projects

112 E 12th ST

Case Date:
9/28/2026

Along the sidewalk and next to a utility pole is a plate on the ground installed by the fiber optic company. At the SE corner of the plate there is a gap between it and the dirt, large enough for a small shoe or animal to step into and be injured.

closed #214387

Utility Construction Projects

Jackson Creek Trail

Case Date:
9/23/2026

Lights out at dark. Very dangerous with e-scooters and e-bikers zooming by. Almost nailed me and my dog. Lights have been off for almost a year now.

closed #214332

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Additional photo for uReport #214330

closed #214331

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Additional photo for uReport #214330

closed #214330

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Detour around closed section of B-Line Trail is not accessible. Following the detour leads pedestrians across a broken tactile curb ramp, across road covered in gravel. The makeshift ramp on the Hopewell side of the street was not able to be climbed by my wheelchair. I couldn't go West around it down 2nd Street on the north sidewalk because it's blocked by stones in the sidewalk. Couldn't go West around it on the south sidewalk because the sidewalk is blocked. Couldn't go East on the north sidewalk because the Seminary Park building has a big drop-off on the sidewalk. I had to ultimately use the Wendy's/Kroger parking lot to get where I needed to go. I'm quite frustrated that detour accessibility is not being planned ahead of time, before a detour is put into place

closed #213155

Utility Construction Projects

813 W Graham DR

Case Date:
8/17/2026

CBU recently replaced a pipe at Broadview and Graham. They filled in the hole and topped it , but now the repair is sinking below road depth and seems to be getting a bit deeper daily. It's becoming a traffic hazard.