Potholes, Other Street Repair
- Case Date:
- 9/7/2017
The street repair jobs done on Hillside after the construction work this week at the intersection of Clifton is not holding up. It's been gradually sinking into the ground over the last four days with all the traffic going over it. It will likely start causing damage within the next few days if it isn't addressed soon. There's another patch that was part of that same effort at the intersection of Nancy, but it's not quite as bad. But I would suspect it will need addressing shortly thereafter since it also shows signs of settling.
Potholes, Other Street Repair
2708 Redwood Circle East
- Case Date:
- 9/8/2017
Big potholes at end of driveway leading to drainage sewer
Potholes, Other Street Repair
1107 S Fairview ST
- Case Date:
- 9/8/2017
Lane markings at the stoplight for the entrance to Cook Pharmica need to be restriped as they are faded badly. Thank you.
Street Lights
963-1025 West Acuff Road
- Case Date:
- 9/8/2017
Street light doesn't come on
- Case Date:
- 9/9/2017
I live on a dead end street (3928 W Geranium Ln) and we have cars come flying down our street thinking they can access the main road. There are children on this street and it is becoming an issue as the neighborhood has increased in size so much the past two years. Please consider installing a "Dead End" sign on this street! Thank you!
Potholes, Other Street Repair
- Case Date:
- 9/9/2017
Subsiding (Vectren?) utility cut on the south side near the east end of E First Street near the intersection with Jordan.
Biking & Walking
900-998 North Fess Avenue
- Case Date:
- 9/10/2017
Fess is a good bike route, but the pavement in this area is so deteriorated that it is dangerous. This is especially true under the railroad overpass because the sudden change from light to shadow makes it almost impossible to see the defects in the pavement.
Potholes, Other Street Repair
701-749 East 9th Street
- Case Date:
- 9/10/2017
There are large screws sticking up from between some bricks that could destroy a bike tire or even damage a car tire.
Potholes, Other Street Repair
- Case Date:
- 9/10/2017
There a new overlay going down in Park Ridge East I'm hoping? Thanks. Mostly curious on a timeline.
- Case Date:
- 9/10/2017
Street light is out at bus stop-house at corner of morningside drive. Kinda near smith street after you turn off. Looks gone now but hope it comes back soon. Adds a lot of safety for our walk to the park.