Potholes, Other Street Repair
4418 E Stephens DR
- Case Date:
- 8/17/2018
After all the utilities repair that's been going on in our neighborhood, our streets were completely ripped up. The city has since started patching the roads, but they've done a pretty slapdash job of it. The new paving is very uneven and there are gaps and places where it's easy to lose your footing. I've already tripped at least once in the last few days when I've been out walking my dog. I'm a young, able-bodied person so I'm sure you can see how it could pose a risk to the other residents in the neighborhood who might be older or less steady on their feet. I hope this patching effort is a temporary fix and not the final product, because that would be unacceptable. I would love to hear back about this issue and whether or not this is a temporary fix. I hope the roads in our neighborhood can be completely repaved when this water utilities project is fully completed.
Debris Removal (Sand, General Street Debris)
- Case Date:
- 8/16/2018
The sidewalk in front of 405 S Lincoln is covered in sand and gravel
Debris Removal (Sand, General Street Debris)
- Case Date:
- 8/16/2018
The sidewalk in front of 411 S Lincoln is covered in gravel.
Potholes, Other Street Repair
1111 S Dunn ST
- Case Date:
- 8/15/2018
The pavement is very broken up on E Grimes at the S Dunn St. intersection.
Potholes, Other Street Repair
1311 S Dunn ST
- Case Date:
- 8/15/2018
There is a pothole on S. Dunn St approximately in the center of the 1300 block. If left until winter, it will get very large.
Potholes, Other Street Repair
1 West Stonelake Drive
- Case Date:
- 8/15/2018
One large dip by road and side ground
Potholes, Other Street Repair
2416 West Stonelake Drive
- Case Date:
- 8/15/2018
Large crack 3 inches wide about 6 ft long
Potholes, Other Street Repair
887 Meadowlands Drive
- Case Date:
- 8/15/2018
2 potholes
Potholes, Other Street Repair
1019 W 14th ST
- Case Date:
- 8/14/2018
Deep n wide
Traffic Signals
2601 East 2nd Street
- Case Date:
- 8/14/2018
Left turn arrow from northbound College Mall Road onto westbound 2nd St. was not working at 5:35 PM on Monday August 13. Sat through four cycles of the light, and left turn arrow never came on. Due to heavy southbound traffic, only one car could turn left on cycle, during the yellow. Traffic was backed up in the northbound left lane of College Mall Road all the way back to Covenanter.