Utility Construction Projects
Spicewood Ln
- Case Date:
- 10/4/2024
There is a utility project happening in the Spicewood subdivision. The yard repair after digging up holes is not up to standard. Instead of smoothing the yard out, big clumps of dirt are being left with straw thrown in them. Yards need to be left in the same or better condition than they were before the project began. The dirt should be smooth and tamped down, excavator tracks in the yards need to be repaired. Please make sure the remaining properties are repaired up to standard and left in the same or better condition prior to the project.
Utility Construction Projects
819 N Indiana Ave
- Case Date:
- 9/3/2024
Fiber optic installation created some cylindrical holes in the concrete and asphalt about 6" in diameter in various locations. At this intersection, there is one that was apparently refilled with gravel, but another was left open and a stepping hazard. It is on the north part of the intersection, just north of where 11th crosses and closer to the east side of the street than the west. We found a concrete core by the side of the road that likely came out of the hole originally so we placed it back in the hole, but it sunk down a ways because it was unsupported beneath and now it needs to be topped off with gravel or the core should be removed and the entire hole filled with gravel.
Utility Construction Projects
2602 N Kinser PIKE
- Case Date:
- 8/3/2024
Tree fallen on power (internet?) lines
Utility Construction Projects
2602 N Kinser PIKE
- Case Date:
- 8/3/2024
Tree fallen on power (internet?) lines
Utility Construction Projects
1403 W 8th ST
- Case Date:
- 8/2/2024
A rubber boot is on the ground by the power pole. It appears to be an insulator.