closed #192851
Potholes, Other Street Repair
11th & Maple
- Case Date:
- 8/13/2024
Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.
Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.
The City has done a great job getting the traffic lights between 1st street onward north on Walnut Street timed so that driven at the speed limit, one can easily drive on Walnut without hitting any red lights. This greatly decreases traffic, improves commute time, and increases gas mileage. It's a pleasure to drive through these timed lights.. except... The new light at Walnut and Smith is not incorporated with the other timed lights. It's a good light for the parents who are dropping their children off at the Project School, and I understand the need for it, but it appears that light is triggered by a vehicle waiting on Smith Ave, and the trigger occurs very quickly once a vehicle stops there to wait. I'm sure this is fine during school hours, as not many vehicles use that light, but during the morning traffic flow, many parents use that light, and that signal interrupts the flow of traffic on Walnut. This could be fixed by eliminating the trigger based on a waiting vehicle on Smith, and incorporating that light with the other timed lights. This traffic pattern works well for all of the other cross streets, I don't see why it would be an inconvenience for anyone waiting at the light on Smith. Thank you!
Traffic on Bloomfield Road (2nd Street) is backed up for about a mile heading out of town (traffic backed up past Landmark) & a half-mile coming in to town (backed up to 37), all waiting on the light at the Sportsplex/apartment complex The traffic light is only giving people on Bloomfield road about 5-10 seconds to get through the light, while the green light for people exiting the Sportsplex lasts about 30-40 seconds - but there's nobody going in or out of the Sportsplex! Could somebody PLEASE take a look at the program/timing of this traffic light?
The new traffic light's timing is too short for traffic traveling east/west on Bloomfield Road. At best it stays green for 20 seconds before switching to red to let 1 or two cars from the Sportsplex/Millennium Apartment's go. Traffic westbound is worse than it was before the installation of the light, somehow.
Sidewalk is blocked from both sides - by a tree on the street side of the sidewalk and a bush on the other side.
This trailer has been left on my property since June. I have contacted my rental company, Sarge, as well as Duke and Gigabitnow to see who it belongs to. I have not found out where it came from. This is a student property with a parking lot behind for over twenty cars. It is taking up space and we residents have to sometimes park on the street, risking a ticket. Please contact me on how I can get this removed.
The cable pullers installing the fiber optics network on our court left a hole in front of my house that's huge and growing. It's nearly a yard long, over a foot wide, and at least nine inches deep. Please repair it.
Westbound traffic on 2nd Street are trying to turn into the new Rockets Convenience Store. I've been in the left turn-lane for Patterson, and someone crossed the double-yellow line to make his own "turn lane" to go into Rockets. The way the entry is shaped there should be no left turn into the facility. Westbound traffic should turn on Patterson and access Rockets the back way. There have been other posts on social media about this. There needs to be a "No Left Turn" sign or something there - it's a prime spot for an accident.
large sidewalk gap on Arlington just north of the new roundabout, on the west side, it seems incomplete, or maybe they are going to finish it soon?
Utility cuts across Crescent Rd need patched & leveled or paved