uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (10288)

closed #131412

Traffic Related Complaints

2757 West Bloomfield Road

Case Date:
4/18/2013

Since the traffic light on 2nd (Bloomfield) and Oakdale Square has been changed it has been creating quite the backup for cars attempting to turn onto Bloomfield. It appears that the lights are now timed to 37, which means that cars driving on Bloomfield speed through the Oakdale square light going much faster than 40. Further, it is now common to see more than 7 cars waiting to turn left onto Bloomfield from Oakdale drive. This creates a backup for those turning left and turning right. The old timing pattern worked sufficiently in that it slowed down the traffic on Bloomfield which regularly goes faster than 40, and it was easier to get on the road from Oakdale. Please consider untying that light to the 37 intersection.

closed #156478

Traffic Signals

2757 W Bloomfield RD

Case Date:
10/10/2016

Driving east on 2nd street. Cross over 37. The straight lane to continue east on 2nd where the turn is to take 37 north. The right side, south side, green light bulb appeared burnt out today around 5:45pm.

closed #164517

Traffic Signals

2755 West Bloomfield Road

Case Date:
5/22/2018

Backed up West bound traffic on Bloomfield Road is made a bit worse with the lights here off sensor during construction. The timing is providing more time than needed for cross traffic and turn lane, should be set much longer for E-W Bloomfield. The light further east at Twin Lakes has very sensitive sensor for cross traffic, also adding to the backup, could let the cross traffic wait longer and reset if they escape with a right turn on red to keep the E-W flow going if it can.

closed #132645

Excessive Growth

2750 South Sare Road

Case Date:
7/5/2013

Vegetation is overgrown and blocking sidewalk

closed #142297

Trails

2750 S Wexley RD

Case Date:
11/10/2014

There has been some construction on the trails near the Wesley Sports complex. I use the trail to commute to work by bike every day and noted its bad constitution - especially after heavy rain. I had hope for some improvements but the 'closed for construction' signs have been removed and while the trail is now wider it seems like the construction has been stopped half way. The trail is still very sandy / muddy and parts are very soft so that my bike sinks into the sandy surface which makes it very uncomfortable to rise and also somewhat unsafe. Is the construction already done or just paused?

closed #164024

Potholes, Other Street Repair

2750 S Leonard Springs RD

Case Date:
4/12/2018

there are still multiple pot holes and very rough areas on Leonard springs Rd. This area sees a lot of traffic through out the day because of the construction going on. These areas are going to cause a major accident because drivers are slamming n their brakes to avoid these areas. The area includes , in front of Woodland Springs Apts. all the way down to 2nd street.

closed #164257

Traffic Signals

275-299 South Dunn Street

Case Date:
5/3/2018

Traffic light is out at 3rd and Dunn.