uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3)

closed #161950

City Performance

Case Date:
12/5/2017

To: Mayor Hamilton, if you could please look at ureport case #161401 from october 3. now it is 2 months later & that crosswalk button at a very busy intersection (west 3rd st & franklin) still isn't fixed. i see mr. cibor's note there from oct.18 but even if he has to coordinate with another agency, it still shouldn't take this long. i am afraid i am going to get hit by a big truck. i cannot walk very fast because of medical problems. also, there will be snow & ice soon, making crossing there even more difficult.

closed #161818

City Performance

Case Date:
11/14/2017

What used to be a 10 minute drive to work now takes close to 35. Why? Construction on Tapp, 37, Rodgers, Walnut, 10th Street, Dunn, Fee, and Gordon Pike closed. There is literally not any route left to get to work. Everyone on the south side is forced to sit in traffic for two to three times the normal length due to terrible planning by the city in the closing of streets and construction that has effectivity shut down part of the city and prevent us from going anywhere or doing anything.

closed #161401

City Performance

Case Date:
10/3/2017

a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks