- Case Date:
- 9/7/2018
There are barricades protecting the bike lane just north of 11th on college, presumably to stop drivers from using it as a right turn lane during construction?? Nice thought but the crane significantly overhangs the barricade. Nvm that the bus stop is hindered.
- Case Date:
- 2/22/2018
construction detour on Kirkwood blocked again by cement truck
- Case Date:
- 6/13/2019
North of 908 North Walnut. East side walk fully obstructed by vegetation on approach to train bridge. There is no alternative sidewalk.
- Case Date:
- 6/13/2019
just south of 913 North Walnut on approach to train bridge west side walk mostly obstructed by vegetation and poison ivy.
- Case Date:
- 6/13/2019
south of train bridge on North Walnut West sidewalk partially obstructed by vegetation it is a very narrow sidewalk with a very busy street we need the full width.
- Case Date:
- 6/13/2019
801 North college. West side walk blocked partially by vegetation on The ground and by poison ivy growing from the side.
- Case Date:
- 6/13/2019
North college south of the train bridge West sidewalk obstructed about a third of the way by vegetation including poison ivy.
- Case Date:
- 6/13/2019
West side wok on North college north of the train bridge 50% obstructed by vegetation.
- Case Date:
- 6/13/2019
East side walk on North Fairview just north of the train bridge at 11th and Fairview about a third obstructed by vegetation. This is a very narrow sidewalk with poor sight lines we need the full width.
- Case Date:
- 6/13/2019
South side walk on West 11th Street just west of the train bridge at Fairview mostly obstructed by ground cover growing on the sidewalk and trees hanging down in the head space over the sidewalk