Utility Construction Projects
2807 S Elizabeth CT
- Case Date:
- 4/4/2023
Gas utility dug up driveway and recently the new cement was put in but they left a large (heavy and immovable) clump on the lawn. Also the edge of the driveway is collecting water from the small ditch next to it they dug up. It’s been about a week now - I thought originally they might come back to take care of it.
Utility Construction Projects
1130 S Madison ST
- Case Date:
- 11/15/2023
There is a dangling guy wire at pole #152-572, located at the south end of Madison St. just north of Patterson/Grimes, at west edge of New Hope for Families property.
Utility Construction Projects
- Case Date:
- 12/12/2023
Can you tell your staff there utilities road work on east 2nd Street I don’t know why they doing utilities work without city permission
Utility Construction Projects
- Case Date:
- 1/15/2024
Which date utility pole removal on Jackson creek trail
Utility Construction Projects
- Case Date:
- 4/21/2022
The electrical poll is damaged and looks to be falling.The poll is on Hillside Drive Bloomington Indiana.
Utility Construction Projects
316 E Cottage Grove AVE
- Case Date:
- 5/14/2022
Att box knocke I
Br
- Case Date:
- 10/5/2022
Fienhydrant usage without back flow protection and meter. Spicewood addition. Contractor is Snedegar working with Duke Energy. 10/5/22 at 7 pm
Water Utility Billing Problems
- Case Date:
- 3/17/2022
When i bought this house 4 years ago, all paperwork said "city sewer" Turns out, my house actually runs on a Septic tank. Was not informed about this till one of your guys had to come over cause my water was backing up through the drains
Water Utility Problems
2631 E Discovery Pkwy, Bloomington, IN 47408, USA
- Case Date:
- 9/28/2022
Should this not have a backflow preventer? IU Health Bloomington Hospital grounds on the drive near the bypass.
- Case Date:
- 12/29/2022
I wish to file a request to the Utilities Dept. to survey the water main line servicing my home and the homes on E. Longview Ave. After two water main breaks in the past thirty days, I believe it would be prudent to survey the line for potential replacement or upgrade as necessary. I understand this survey may take time to allow staff to develop a plan. I hope that you might have equipment to survey to determine if there may be more weaknesses in the line or that a span of the line ought to be replaced. I would guess after two breaks, this request for survey might already be on your to do list at least for Spring 2023. Thank you -