Sidewalk & Curb Complaints
2697 E Rock Creek DR
- Case Date:
- 3/16/2022
Sidewalk and driveway entrance concrete is torn up and needs to be repaired.
My wife is blind and just walking in front of our house is dangerous for her and anyone walking by.
Sidewalk & Curb Complaints
314 1/2 S Henderson ST
- Case Date:
- 4/13/2022
Sidewalk always floods. Forces pedestrians to walk in the mud or on the street. Not safe.
Sidewalk & Curb Complaints
3109 S Daniel ST
- Case Date:
- 7/3/2022
There is a damaged sidewalk with a large crack and significantly uneven surfaces causing a tripping hazard. Many less severe problem spots on sidewalks in the neighborhood have been fixed in the last 1-2 years, but this one was not. Thank you for the attention.
Sidewalk & Curb Complaints
445 S Landmark Ave, Bloomington, IN 47403, USA
- Case Date:
- 4/18/2023
I was using my power chair to travel to the other side of Landmark Avenue to find a working crosswalk. When I got to the portion of sidewalk that borders the Anderson Medical Product's back parking lot (where they park all their vans), there was a curb with no curb cut, so I couldn't get onto the sidewalk.
Sidewalk & Curb Complaints
1234 S Fenbrook LN
- Case Date:
- 4/16/2023
Sidewalk covered in thick mud and water
Sidewalk & Curb Complaints
2519 E Canada DR
- Case Date:
- 5/22/2020
Sidewalk is raised about 5-6 inches by tree root, making it dangerous for pedestrians and individuals with walkers or wheelchairs. This is on the north side of East Canada drive at 2519.
Sidewalk & Curb Complaints
3312 S Rolling Oak DR
- Case Date:
- 4/8/2021
Sidewalk raised 4" at this address. West side of street.
Sidewalk & Curb Complaints
3312 S Rolling Oak DR
- Case Date:
- 5/13/2021
Significantly raised sidewalk at 3312 S Rolling Oak
Sidewalk & Curb Complaints
424 S Fess AVE
- Case Date:
- 11/3/2022
tree branch has broken off and it falling onto the road and sidewalk a bit, medium sized not huge
Sidewalk & Curb Complaints
1010 E 1st ST
- Case Date:
- 12/9/2022
Broken Sidewalk. Upheaval by tree in tree plot. Developing over 3 years. Marked with white arrows some time after March 2022. Could it be prioritized? Thanks.