Potholes, Other Street Repair
710 S Fess AVE
- Case Date:
- 4/24/2020
Alley that runs N/S from 1st to University between Henderson and Fess has some gravel on it but is paved. Very big pot holes bottoming out cars. 5 homes must use alley to park plus we have 4 other homes that will use to get to offshoots of the alley. Had a couple potholes filled maybe three years ago but there’s a few now that are hard to drive around.
Potholes, Other Street Repair
710 S Fess AVE
- Case Date:
- 1/10/2022
Potholes have grown in the N/S alley that runs from 1st St. up to University St. Alley is paved with gravel over top. Lots of potholes but worst two are 1) between 710 S Fess and 715 S Henderson and 2) near the decorative stone corner at the intersection with the E/W alley that runs from Henderson to Fess. There are a few more down by where they just did a fresh pave up from the south end by 1st a few years back but they aren't as bad.
Potholes, Other Street Repair
710 S Rose AVE
- Case Date:
- 4/6/2021
This speedbump, on East 1st, between Eastside & Rose, is surrounded by potholes. The attached picture faces west. There always seems to be water standing here. It is unclear whether it is bubbling up from below the ground, or is some sort of stormwater runoff, but it seems to be eroding the street here.
- Case Date:
- 4/25/2023
1st St @ S. Rose Ave NW corner stop sign
Debris Removal
712 E Hunter AVE
- Case Date:
- 11/13/2021
Clean up glass from shattered bottles in alley won’t be able to drive through
Potholes, Other Street Repair
712 W Glen Arbor WAY
- Case Date:
- 12/31/2020
Major depression on west side of road, right before the mailbox for 712 W Glen Arbor Way filling with water and also a wide pothole.
Potholes, Other Street Repair
713 S Clifton AVE
- Case Date:
- 11/6/2020
Along the block of s. Clifton running between 1st and 2nd street there are a number of potholes in need of patching. Thanks!
Potholes, Other Street Repair
713 S Walnut ST
- Case Date:
- 4/14/2023
There is a pothole in the right lane on Walnut.
Potholes, Other Street Repair
714 S Woodlawn AVE
- Case Date:
- 5/26/2023
The asphalt of the city-maintained alley is degraded. The alley is on the 700 block of South Woodlawn Ave, on the west side of the street. This alley is important for access of utility workers including Duke Energy employees.
Street & Traffic Signs
715 E 2nd ST
- Case Date:
- 9/16/2023
2nd and Fess stop sign missing