Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 11/7/2023
Street repaving request for East Longview Ave.
Looking for the 2024 paving schedule, may not be released yet.
East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish:
-Repaving needed overall
- Install updated traffic calming bump design replacing current full width bumps.
-Stripe the bike path lane stripe as it's part of the E-W bike greenway.
And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park.
We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
Street Lights
219 E 7th ST
- Case Date:
- 11/7/2023
Two lights out
Potholes, Other Street Repair
1016 W Kirkwood AVE
- Case Date:
- 11/1/2023
There are two potholes in the eastbound lane of West Kirwood Avenue by Rose Hill Cemetery that are growing rapidly. Road base material is exposed.
Traffic Signals
1313 E Matlock Rd, Bloomington, IN 47408, USA
- Case Date:
- 10/30/2023
The traffic light is down and it caused a huge traffic
Street Lights
852 W Rosewood DR
- Case Date:
- 10/30/2023
The Street light bulb is out.
Street Lights
2501 E 3rd ST
- Case Date:
- 10/29/2023
I often find that this light is red for traffic on 3rd street, with many cars stopped and waiting most times I cross this intersection. There is much more traffic on 3rd street than Woodscrest and Hillsdale. It has often led me to believe that the light might be mistimed, biassed towards the traffic crossing 3rd street.
I am not at all sure that it is indeed mistimed, but it seems like it, and might be worth checking if there is a way to assess that issue. (I don't know how street light timing is optimized)
Thanks for considering!
Sincerely,
Andrew Goldman
Potholes, Other Street Repair
827 W 11th ST
- Case Date:
- 10/29/2023
Small pothole in front of driveway at 11th and Blair. Hopefully can be repaired before winter!
Potholes, Other Street Repair
1009 W 11th ST
- Case Date:
- 10/28/2023
Two new potholes opened up, hoped they could be patched before winter. THANK YOU!!
Potholes, Other Street Repair
305 E 9th ST
- Case Date:
- 10/19/2023
Alleyway road is crumbled and impossible to drive on
Potholes, Other Street Repair
808 W 6th ST
- Case Date:
- 10/19/2023
There is a pot hole in the 800 bock of W 6th St. It should be patched before freezing weather ends access to hot asphalt.