uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3367)

closed #173954

Website & Web Services Feedback

Case Date:
10/16/2020

center turning lane was installed in front of lake view school and entrance and exit lanes on private property at THE pointe was used to widen road, entrance lanes need to be put back the way they were the new change creates an obstruction of view exiting the pointe if center lane is needed then widen the road by using front of school property that is not used thank you Mike Sears.

closed #173958

Traffic Related Complaints

Case Date:
10/17/2020

You have a crosswalk with a planter. The huge sidewalk you are putting in has made the road too narrow. You should make the crosswalk planter small so the road is not too narrow. Will the new, much narrower road meet the width requirements? Seems like this is just going to create accidents and the city is being negligent.

closed #173969

Potholes, Other Street Repair

Case Date:
10/19/2020

It looks like the road had settled and they chose to fix the issue by adding asphalt over the concrete road. It turn basically made it a speed up a couple years back. We unfortunately have huge semis and overloaded tractor trailers flying down our road. The thud from these hauling trailers can me felt all throughout my house. I have noticed since buying the house two years ago, that these constant vibrations are affecting the foundation on my house. My next door neighbor and I have had enough. I don’t know why the city chose to fix the settled road this way but it is cause far more damage to my property than it is the cars and semis driving over this area. I’ve already filed a complaint over a year ago and nothing has been done.

closed #173975

Street & Traffic Signs

Case Date:
10/20/2020

How do we go about getting a street sign for our new edition off of 46? Charelstowne Manor- Triple Crown Drive?

closed #173992

Potholes, Other Street Repair

Case Date:
10/22/2020

I am a EC commissioner and Utility Dept Storm sewer volunteer and have been trying to keep my neighborhoods storm drains clear to prevent street flooding. I have been removing pavement fragments for several months that have washed downhill to the storm sewers at the intersection of Queensway and Chelsey Court. Today I cleared the debris from these at this location and added new eroded pavement that have been washing downslope to the drains. I consolidated the material on the curb and grass at the northeast drain at the intersection. This material can and has obstructed the drains and some has washed into the underground sewer line. Thus these drains when obstructed can result in street flooding, blocking the underground storm sewer and result in stream water contamination. Can these debris be removed and disposed of? Also before winter the patches of deteriorating black top be patched? Don Eggert 1235deggert@gmail.com

closed #174002

Potholes, Other Street Repair

Case Date:
10/25/2020

There is a missing utility cover (about 6 inches across) in the roadway intersection of Hillside, Olive St. and Whitestone (Deer Park). It has been missing for at least a few weeks, possibly since Hillside was re-paved.

closed #174012

Website & Web Services Feedback

Case Date:
10/26/2020

There has been activity (underground utility location)and Duke Energy power pole in the easement next to my home at 709 E Wellington Court, 47401. I would like to know what activity (digging?) maybe in the near future. Also there is a underground ATT line to my home that crosses the easement. Thank you

closed #174016

Potholes, Other Street Repair

Case Date:
10/27/2020

large pothole on south side of Rock Creek Drive, just past Childs Court. Would be nice to have it repaired; traffic going east swerves into other lane to avoid the hole.

closed #174021

Potholes, Other Street Repair

Case Date:
10/27/2020

Potholes on Rogers, coming from the intersection with First, heading towards the intersection with W Second, across from the hospital parking lot.

closed #174029

Potholes, Other Street Repair

Case Date:
10/28/2020

At the construction site, there is a sharp drop from the pavement to where they are milling the road. On the other side of the work, there is a sharp edge going back to the regular pavement. I feel that the this situation can damage cars if the driver does not know to slow down. The edges of the construction is not very visible at night. I would like the city to install asphalt transitions from the regular pavement to where the road under construction is being milled. If nothing else, at least put warning signs at the transitions.