closed #179583
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
Construction site utilizing alleyway creating potholes and divots
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
In front of house 725 E Second Street is a nasty utility cut.
Call toes second and Lincoln and second and College. Popo also third and Cory. Utility cut 914 E. Atwater has sunken
East 914 Atwater utility cut needs filled in
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!