open #186252
Biking & Walking
250 S Washington St Suit 1, Bloomington, IN 47408, USA
- Case Date:
- 11/9/2023
Hello- Car blocking the bike lane on washington between 4th and 3rd Sts at 6:13pm 11/9/23. Plate: ZUK434 thank you!
Hello- Car blocking the bike lane on washington between 4th and 3rd Sts at 6:13pm 11/9/23. Plate: ZUK434 thank you!
Why is all traffic being dangerously rerouted through residential neighborhoods on the east side from the construction?
At the intersection of Pete Ellis and John Hinkle, where the multi-use path crossses the road, we need a crosswalk. This is a busy T intersection, and there are pedestrians.
The entire brand new bike path has been barricaded from Kinser to Arlington. It looks like all that is going on is a single truck with a trailer parker on the path near the skate rink. Seems like a bit of overkill to close the whole path down for residents!
Sidewalk floods every time it rains and leaves a thick layer of mud
Sidewalk covered in mud and gravel from poor drainage
High winds caused a tree from the common area to come down and is blocking the sidewalk.
Vegetation needs to be cut back as it forces pedestrians to walk in a busy street. This issue was raised last summer and was ignored. Thanks
many limbs hanging down on sidewalk along hilleside dr this location
Sidewalk overgrown downhill from this address