open #188194
Potholes, Other Street Repair
1376 S College Mall RD
- Case Date:
- 4/30/2024
in the turn lane from westbounnd e moores to northbound college mall there's a square of asphalt that was cut out and never replaced
in the turn lane from westbounnd e moores to northbound college mall there's a square of asphalt that was cut out and never replaced
Large pothole
Across from 1011 on S High street, near the STOP sign, going towards E Covenanter Drive, there is a rather large square piece of pavement missing, which makes for a big bump when you drive over it.
sink hole opening and erosion is in line with gas line at 3420 E Grandview Dr.
Alley on the north side of 112 W 6th Street, Bloomington IN: there is a guardrail installed, the base is utterly deteriorated, very loose to the touch, poses a danger to pedestrians and any vehicular traffic brave enough to use the ease and/or north alley. Needs to be repaired. Thank you.
The utility manhole covers in the Northbouand lane of Walnut Street from Miller Drive to Grimes are below the pavement level and need to be raised to pavement lever. This condition has existed since Walnut Street was re-paved years ago. Please fix. Thank you
Flooding down Brownridge is starting an erosion hole again the road side with a drop of about 3 ft. from the road bed. A short load of stone (2-3 yds maybe) added to the previous should solve it; the last treatment has remained stable and has worked well.
The potholes going into The Village are INSANE. I have called and called the office and have yet to get a clear answer as to when these multiple potholes would be filled. One of my friends works in the office and said they are aware- and are also aware they are 4 inches deep. The road going into the complex is very narrow and now filled with potholes- making it impossible to avoid them. These will cause very serious damage to my car.
I don't have a current photo but particularly since the utility work completed on this stretch of road the parking spots in front of the shops flood and hold water. The gradient actually seems to slope away from the drain instead of towards. As a result, we frequently have to bail out the parking spots to make them usable for customers. Flooding issues include the accessible parking spot, which poses a risk to the mobility impaired. How can we best collaborate on a solution? Thanks!
On the corner of Covenanter and high on the right as you’re heading south on high there’s a dangerous drop off into a rocky drainage area that needs to have a guardrail or some type of protection. The road lists in the direction of the drop off and at some point fire and rescue is going to have to fish a car out of the drop off. Not sure how this was allowed to be built without a guardrail. It may be the biggest pothole in the city.