closed #182049

Sidewalk & Curb Complaints

3335 E Moores PIKE

Case Date:
11/10/2022

The sidewalk from here all the way to the pedestrian crossing at Olcott sucks. It's an awful garbage sidewalk. There's been several reports about it being unsafe, and it's constantly blocked by vegetation. It's narrow and precipitous in places. Anything wider than a sedan risks clipping pedestrians.

closed #182191

Sidewalk & Curb Complaints

710 E Maxwell LN

Case Date:
12/2/2022

Ever since the city installed curb bump-outs for on-street parking some years ago, drivers have been blowing out tires and ruining wheel hubs at the southeast corner of Maxwell Lane and South Fess, usually as they are driving south on Fess and turning east onto Maxwell. I know this issue has come up before, and various solutions have been tried, but something more substantive needs to happen -- either reduce the projection of the curb or get rid of the bump-out altogether. I would estimate 15-20 drivers a year hit this curb. Yesterday, it happened twice. One driver was lucky and just blew out a tire. The second had to call a tow truck, which we see over and over again. Each driver thinks he/she is the only one to do this, so they don't think to tell the city. Please do something to fix this problem. It's costing people time and money on a regular basis. Thanks!

closed #184238

Sidewalk & Curb Complaints

1001 E 1st ST

Case Date:
6/18/2023

Overgrown vegetation on the north side of E First St is blocking the sidewalk

closed #184534

Sidewalk & Curb Complaints

918 W 2nd ST

Case Date:
7/10/2023

Line of sight issues. Can’t see to get out of the alley tree plots are blocking my view to pull out. Very dangerous. I complained last year and nothing was done. Worse this year

closed #185003

Sidewalk & Curb Complaints

3220 E 3rd ST

Case Date:
8/11/2023

Black top sidewalk put in by apartment contractors at Clarizz and 3rd looks like a turning lane!! Paint the curb and put walking sign on “sidewalk” ASAP please…. Tire marks already on curb where folks have hit it.

closed #173559

Sidewalk & Curb Complaints

2487 S Brittany LN

Case Date:
9/1/2020

The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.

closed #174547

Sidewalk & Curb Complaints

606 E Moss Creek CT

Case Date:
1/20/2021

there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please

closed #175987

Sidewalk & Curb Complaints

2110 S High ST

Case Date:
6/2/2021

So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.

closed #176799

Sidewalk & Curb Complaints

4007 E Stonegate CT

Case Date:
8/2/2021

There are multiple low-hanging trees on the south side of E Hagan Street that make the sidewalk difficult to pass. I believe these are city-maintained trees on the easement.

closed #177021

Sidewalk & Curb Complaints

2003 S High ST

Case Date:
8/16/2021

It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.