closed #178020
Sidewalk & Curb Complaints
455 N College AVE
- Case Date:
- 10/28/2021
This brand new curb now retains rainwater. Any plans to fix this?
This brand new curb now retains rainwater. Any plans to fix this?
Dead end on east end of E. Sheffield Dr. Traffic is entering through a non driveway from wooded area creating potential traffic hazards. Trucks are removing the center diamond sign and driving into private property (not a city issue). Utilizing roadway improperly and potentially damaging city sign. Solution would be to erect a metal guard rail at the dead end to stop traffic entering through an unauthorized driveway in the city and lessen the traffic on the city street in this quiet neighborhood.
edge of paving is disintegrating all along front of driveway and curb. The entire street has this problem, worse in some spots than others. Yesterday you patched my next door neighbor's, but didn't address any of the others.
The street light directly across from 4512 E. Cambridge Court is out.
damaged pedestrian sign
Metal sign is laying down. The whole pole
Pot hole behind 498 E Varsity Lane. Also, around four smaller pot holes along Varsity Lane.
After all the utilities repair that's been going on in our neighborhood, our streets were completely ripped up. The city has since started patching the roads, but they've done a pretty slapdash job of it. The new paving is very uneven and there are gaps and places where it's easy to lose your footing. I've already tripped at least once in the last few days when I've been out walking my dog. I'm a young, able-bodied person so I'm sure you can see how it could pose a risk to the other residents in the neighborhood who might be older or less steady on their feet. I hope this patching effort is a temporary fix and not the final product, because that would be unacceptable. I would love to hear back about this issue and whether or not this is a temporary fix. I hope the roads in our neighborhood can be completely repaved when this water utilities project is fully completed.
eastern heights streets are developing lots of cracks in asphalt pavement may require sealing before freezing weather arrives
tree limb down on road. Road behind Holiday Inn.