City Construction Projects
3449 E Longview AVE
- Case Date:
- 4/9/2023
Park Ridge neighborhood: Partnered with the traffic calming bumps are stakes with reflectors to bring driver's attention to the speed bumps. Nearly all of the stakes are missing the reflectors or the reflectors are damaged. Some of the pairs of stakes have one of the stakes missing like in front of my house. (A lawn service damaged it and removed it).
So please survey and replace the missing reflectors and a couple of the missing stakes. The stakes with no reflectors appear dangerous. Like "Games of Thrones" dangerous. It was odd at the conclusion of the 2022 Morningside repaving, that the new version of traffic calming bumps was installed (thanks), but the stakes were ignored in terms of reflectors. We appreciate your attention on this item.
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 11/7/2023
Street repaving request for East Longview Ave.
Looking for the 2024 paving schedule, may not be released yet.
East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish:
-Repaving needed overall
- Install updated traffic calming bump design replacing current full width bumps.
-Stripe the bike path lane stripe as it's part of the E-W bike greenway.
And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park.
We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 12/4/2023
Hello Joe and Street Dept. staff. We sure appreciate you adding the new strips to the speed bumps on E. Longview Ave. Unfortunately one and maybe a second have come unglued. Sorry to see it and wanted to inform you ASAP. Thanks again for the action!
Steve Akers
Traffic Suggestions
3433 E Longview AVE
- Case Date:
- 11/14/2023
paint on the speed bumps has faded along Longview and the speed bumps are difficult to see. It would be great if they could be repainted. Really all of Longview needs repaving, but I know that isn't happening this year and it would be helpful if the painting could happen sooner rather than later to increase the visibility of those bumps.
Street & Traffic Signs
3433 E 3rd ST
- Case Date:
- 3/31/2023
stop sign bent over from accident at e 3rd and morningside drive
Potholes, Other Street Repair
3425 E Longview AVE
- Case Date:
- 1/26/2017
While we do have a pothole at the edge of our driveway that extends into the culdesac and city street one which we live, I'm reporting here a request to extend the curb in the culdesac to the area in front of our house. I have sent in a few requests over the years to the City of Bloomington to get the curb extended and have never heard back. We regularly have folks parking in our yard (probably inadvertently), causing further erosion issues in our yard. Thank you.
Traffic Suggestions
3421 E Longview AVE
- Case Date:
- 10/10/2022
Four way stop at E. Longview and N. Glenwood West.
Issue: vehicles fail to fully stop at stop signs. Hazard and safety concern for pedestrians and park users in this four-way stop location.
Request: Mark stripes at each stop sign where vehicles are to fully stop. This to cause some attention to this stop sign issue where folks roll through and sometimes do not stop this causing danger for park users in the "hill area" chasing a ball and small children. Just requesting four bold stripes to delineate the stop sign marking on the street to emphasize the requirement to stop.
Please reply so I know that you have received this request.
Thank you on behalf of me and Park Ridge neighbors.
Biking & Walking
3417 E 3rd ST
- Case Date:
- 9/9/2023
The pedestrian light to cross third street often doesn't work and it becomes impossible to cross the street at the intersection.
Traffic Signals
3417 E 3rd ST
- Case Date:
- 12/1/2020
The vehicle sensors on Clarizz don't seem to be detecting correctly. I have set at that intersection, and the traffic signals take a long time to change, even if there's no traffic on 3rd Street. Wasn't sure if that is the way it is supposed to be or not.
Potholes, Other Street Repair
3411 E Grandview DR
- Case Date:
- 4/29/2024
sink hole opening and erosion is in line with gas line at 3420 E Grandview Dr.