Street Trees
2011 S High ST
- Case Date:
- 7/2/2022
One of the new street trees planted by the city after the completion of the new north extension of the Jackson Creek Trail last fall has unfortunately died, and should be replaced. It is sending up suckers at the base, but I don’t think a large shrubby plant is what was intended. Tree is near the property line of the house on High and the house on the corner facing Wimbleton. Thank you!
Blocked Sidewalk
612 S Fess AVE
- Case Date:
- 7/7/2022
Big rock at tree plot and alley in front of this property has been knocked into the sidewalk r/o/w. It has been obstructing the sidewalk for over a month
Street & Traffic Signs
501 E Dodds ST
- Case Date:
- 7/12/2022
Due to parked cars on east & west sides of Dodds, it is challenging to see oncoming traffic to turn left or right off of S. Dunn. Especially during rush hour, I’ve had several close calls with oncoming cars. A 4-way stop would be very helpful there. Or limiting parking on Dodds.
Blocked Street
2021 E Wexley RD
- Case Date:
- 7/13/2022
Street & Traffic Signs
1000 S Lincoln ST
- Case Date:
- 7/21/2022
It would be great to have a no parking to corner sign here. From a biker's perspective, it is uncomfortable for oncoming traffic/turning traffic, if a car is parked near the stop sign/line.
Temporary Signage w/o permit
3802 E Regents CIR
- Case Date:
- 8/28/2020
Flag at exit of regents court onto e. Moore's. It's just tied to a hedge.
Temporary Signage w/o permit
684 S Smith RD
- Case Date:
- 8/31/2020
Signs placed in the ROW at the Gentry Honors entry at Smith Rd. and Bennington Blvd. Other signs also placed at the intersection of HWY 446 and Bill Mallory Blvd in the tree plot and the shelter house near the pool at Gentry Honors.
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.
Parking on Unimproved Surface
400 S High ST
- Case Date:
- 9/15/2020
Recently the front yard of this property was largely covered with gravel. There were today 4 cars parked on what used to be partly a yard. It's strange and degrades the street and neighborhood. Is this legal?
Blocked Street
3518 S Tudor LN
- Case Date:
- 9/30/2020
The beginning of road work at E. Moore's Pike and Sare Road has created a very bad interruption to the flow of traffic. I am wondering if there would be a better way of achieving what the work is intending to achieve there. It is just too much disruption.