closed #174025
Blocked Street
- Case Date:
- 10/28/2020
17st is still shut down. 2 years this road has been shut down. Can anyone please explain why? This is beyond believable.
17st is still shut down. 2 years this road has been shut down. Can anyone please explain why? This is beyond believable.
Our trash hasn't been picked up for the past two weeks even though we have left it by the curb both times. Our recycling has been accessed and picked up however.
Hi, to clarify the previous ticket since I don't know how to respond back on the ticket, the trash people have not been picking up our trash for the past two weeks. I am aware that it is our trash can but I want to see why the trash isn't getting picked up.
At the construction site, there is a sharp drop from the pavement to where they are milling the road. On the other side of the work, there is a sharp edge going back to the regular pavement. I feel that the this situation can damage cars if the driver does not know to slow down. The edges of the construction is not very visible at night. I would like the city to install asphalt transitions from the regular pavement to where the road under construction is being milled. If nothing else, at least put warning signs at the transitions.
Two potholes on N Staats drive on the eastside. Please patch as soon as possible. Thank you
Last night a car drug a combo stop sign/street sign and pole into the parking lot of our apartment complex. (Kingston Manor)
On Grimes Lane, in the 700 block, between Woodlawn and Henderson, the street is so dirty and full of leaves, other debris, that 3-foot high weeds are growing in the crevice between the curb and sidewalk. It's very unsightly.
East side of 10th and rogers, crosswalk partly blocked by construction sign near trades district garage site
Why has the construction project on West 17th not been completed? Don't tell me it is behind schedule. I want specifics.
Please post an update on the Vernal Pike/Seventeenth Street project. Seventeenth Street was closed in April 2019 and was to be reopened in November 2019. When will the street be opened?