closed #173542
City Construction Projects
2701 E 3rd ST
- Case Date:
- 8/30/2020
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
B-line light posts 41 and 49 are out. Thank you.
All four lights are out on the B-line bridge over 3rd Street. The area is unusually dark because the park lot behind the Convention Center has been entirely unlighted since about March.
Signs placed in the ROW at the Gentry Honors entry at Smith Rd. and Bennington Blvd. Other signs also placed at the intersection of HWY 446 and Bill Mallory Blvd in the tree plot and the shelter house near the pool at Gentry Honors.
there is trash all over the complex
Problem with improper recycling and buildup of trash through two Monday pickups at 528 N Washington although trash is put out on 10th Street in 200 block. Blocking sidewalk and pedestrians. Would submit photo but having issues with that. Not a good look on 10th street. Please help.
The line of sight problem at W Dodds and S Fairview is not resolved and should not be closed. Ticket 173486 Plants till lean out into the roadway blocking LOS. Whatever the resident may have done has not helped. Please make the intersection safer and truly resolve the situation.
The Boys & Girls Clubs of Bloomington- Lincoln St Unit has smelled like sewer gas for the last month. There is standing water in the sewers outside of the building. It is very difficult to run a full day of program when my staff and our members have to deal with the strong smell of sewage.
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.