- Case Date:
- 12/1/2023
See case #186273 - tall sign in yard that has been there for six months. Being held in place by sandbags. Can even be seen on google maps. Who is responsible for removing this? Can we just sell it for scrap?
- Case Date:
- 12/4/2023
See #186397. The referred case (#186273) clearly has an address. The sign is still there. Please do something about it.
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
Blocked Sidewalk
911 N College AVE
- Case Date:
- 12/6/2023
Hi - this is follow-up to ureport #186407. It is the sidewalk on the west side of College Ave just south of 14th street, near the train bridge.
First off, thanks for your prompt attention! Unfortunately, the sidewalk is still not its full width. The historical sidewalk is about 8ft wide, and I believe pedestrians should enjoy the full width that was provided decades ago. I drew a red line on the photo to show where the edge of the sidewalk is. Everything to the right of that red line is vegetation and dirt that is encroaching on the sidewalk.
What is to be done? I have done this work myself at the 11th&Fairview train bridge. I can do between 25 and 50 linear feet of this kind of work per hour with a shovel. This would generate nearly a yard of waste dirt which will need to go somewhere. An ideal solution would also stabilize the hillside but please don't let the perfect get in the way of the good. Please forward this to Director Wason as that sort of investment will require some leadership. I have watched work crews use line trimmers to move dirt and sand, which seems like a failure to provide the tools for the actual task they face.
If pedestrians aren't worthy of this sort of consideration from the city, please let me know. Thanks! - Greg 812-391-3535
- Case Date:
- 12/8/2023
Sign Doc work truck currently parked on the 7 line bike path at College Ave.
- Case Date:
- 12/12/2023
8th st actively blocked right now by trucks at Johnson creamery. Unsafe by bline and crosswalk.
City Construction Projects
- Case Date:
- 12/12/2023
Kyle do you know when duke project done on 321 Roger street
City Construction Projects
- Case Date:
- 12/12/2023
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray
Traffic Related Complaints
1700 E Camby LN
- Case Date:
- 12/15/2023
On going fiber install continues through lunch and doesnt stop by 5. Excess equipment noise and heavy equipment and truck movement.
Utilities Construction
719 W 7th ST
- Case Date:
- 12/15/2023
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.