uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (826)

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #148989

City Performance

612 N Washington ST

Case Date:
10/9/2015

Trash all over porch 612 n Washington

closed #172281

City Performance

320 W 8th ST

Case Date:
4/22/2020

I knew Longview and Pete Ellis were getting some apartments built in that lot, but apparently it is going to be more than usually allowed? I am SUPER concerned that you're going to be packing extra students (almost all will have cars) on a road that is NOT designed for heavy traffic but SUPPOSEDLY a bike path for bikes. It might be great, but what are the extra precautions taking place to ensure students zipping in and out won't disrupt the greenway and kill cyclists? Hoping some will be cyclists, but realistically there is going to be a lot of in and out speedy traffic there for what was a very calm road fantastic for biking. Want to make sure it's not overlooked. Also, anything big built east of College is going to experience major backup on rush hour times at College and 3rd. I know it's a state intersection but the city needs to look into it and factor in the ability of that intersection to take on more traffic. Something needs to change there. It literally clogs (outside of a pandemic) constantly with left turn traffic from 3rd turning south to College, which block eastbound 3rd street. Time and again. Part of the problem is it clogs at the next light (the city's I would imagine) by Fazoli's as the lights aren't coordinated well if at all. So two concerns: not a bad place to live, including for students - way better than century village hotel, but make sure the bike path remains safe! This can't be presumed. That area will change big time and cyclists need reassurance. And 2) light at 3rd and College is going to be negatively impacted and timing or something needs to be looked at there. The east/west greenway I was hoping was going to be getting ENHANCEMENTS in the next year or two, not becoming a motorist highway :( Thank you.

closed #173300

City Performance

121 S Smith RD

Case Date:
8/8/2020

Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.

closed #184675

Debris Removal (Sand, General Street Debris)

451 N Pete Ellis DR

Case Date:
7/19/2023

Dirt, sticks, mud on sidewalk makes it difficult to walk on.

closed #186915

Debris Removal (Sand, General Street Debris)

614 N Lincoln ST

Case Date:
1/26/2024

Ongoing construction project - workers have been leaving rubbish in a pile in front of the house for months.

closed #179061

Debris Removal (Sand, General Street Debris)

218 N Madison ST

Case Date:
2/23/2022

A large, white container filled with construction waste (apparently toxic) has been sitting on the SE corner of Madison and 7th for several months, ever since the construction of the "7-Line" bicycle path.

closed #175709

Drainage or Runoff

202 S Rogers ST

Case Date:
5/6/2021

The southwest corner of 4th and Rogers intersection has terrible drainage and creates a giant puddle that makes it impossible for pedestrians to cross without stepping into inches of pooled water. The harder it rains, the worse it gets. The giant puddle doesn't go away quickly, either. Please fix this sidewalk.