closed #185065
Trails
3401 W Wapehani RD
- Case Date:
- 8/16/2023
The middle trail with bridge across main creek is really over grown, very difficult to walk let alone ride.
The middle trail with bridge across main creek is really over grown, very difficult to walk let alone ride.
there is a broken board on a bridge on south side of park.
Some gravel washed onto the Jackson Creek Trail near the north end and needs to be removed
fallen tree at the entrance to rca trail by starview lane, 2 spots with trail blocked by fallen trees
The port-o-let in the parking lot for Clear Creek Trail off Church Lane has been damaged. It looks like it's been hit by a vehicle. The door is hard to latch and there's a large gap between the back and right side panel giving a peeping tom clear visual access inside. I noticed this on Friday, 9/1, someone else may have already reported this. Thank you.
The page https://bloomington.in.gov/parks/trails/southeast-trail is blank. I'd like to see a map of what constitutes this trail. E.g. does it follow the creek bed and end at Sare road?
There is someone tent camping in the approximate location of the pin in the above photo
The shrubbery along the west side of the trail around the Winslow sports complex needs to be pruned back especially in the area near the wooden bridge. It's growing halfway across the trail. The shrubbery near the south east corner of the trail might also benefit from some pruning.
The bike path along Sare Road south of the intersection with Olcott is rapidly deteriorating due to continuous water flow over the path that washes dirt, branches and rocks onto the path. Something needs to be done to divert this water away from the path. In the winter the water freezes, leaving the path coated with a sheet of ice. Very dangerous for bikes and pedestrians.
I've recently noticed the Rail Trail between Country Club Drive and Gordon Pike has sections of large gravel (see attached photo). I appreciate that maintenance is being done, assuming the City is responsible for this work. But, I am concerned because this large gravel is inconsistent with the existing surface for the trail. As a bike commuter and runner on this section of the trail, I was disappointed to see large gravel appear on the surface. The Rail Trail is a great surface to run and walk on and commute on. These patches of large gravel pieces diminish it's utility and enjoyment. Are there plans to use large gravel more often on the trail? I request that the smaller, packed surface be maintained. Thank you for your attention to this matter. I look forward to hearing from you about the maintenance of the trail. Have a great day.