- Case Date:
- 3/9/2025
Pothole repair crews do no heat preparation to existing potholes before filling them with cold patch. They also don't sufficiently pack down the patch. This results in an inadequate bond of cold patch to existing pavement, which leads to rapid failure of cold patch. Some potholes are being re-patched every month and continue to increase in size due to improper repair methods. It would be more effective and less costly to do the patch right the first time.
City Performance
Rockport Rd
- Case Date:
- 3/11/2025
Potholes: on Rockport Rd starting at the stoplight by the southern hills church to graham Rd. People swerve to miss the potholes they are deep and it's dangerous. Please fill in these potholes. This is very highly traveled road. The potholes being filled would be very appreciated.
City Performance
632 N Adams St
- Case Date:
- 6/1/2025
One square of sidewalk in front of the house was replaced last week. A pile of excess cement mixture was left on the lawn next to the replaced paving and has now dried. It is going to be a pain when mowing, and also looks terrible. Please send someone to remove and dispose of the excess/abandoned cement from the yard.
City Construction Projects
- Case Date:
- 5/11/2018
Missing a street sign (name of street(s)) at the corner of Andrews Circle and Coleman Court South. Without street sign, difficult for service personnel (AT&T, Direct TV, Heating and Air, others) to find homes on Coleman Court. Have had to stand outside and wave down personnel looking for our home at 1544 S. Coleman Court.
City Construction Projects
- Case Date:
- 10/3/2018
Vehicle barricade on Ralston & Madison broken on E side of intersection. W side is down.
City Construction Projects
2901 S Olcott BLVD
- Case Date:
- 5/5/2019
2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.
City Construction Projects
427 N Washington ST
- Case Date:
- 9/6/2016
Sidewalk has lifted due to tree roots
City Construction Projects
- Case Date:
- 10/16/2012
i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
555 N Morton ST
- Case Date:
- 8/11/2015
Side walk lift (5")