closed #203454
Blocked Sidewalk
908 North Madison Street
- Case Date:
- 6/16/2025
The trees block the sidewalk entirely and I have to walk in the bike lane to get across.
The trees block the sidewalk entirely and I have to walk in the bike lane to get across.
The multiuse trail between 1099 Winslow Rd and the intersection of Winslow and Xavier Ct. has hazardous head-height tree branches. Particularly on a bicycle, it is challenging and dangerous to navigate down the hill while ducking and swerving to avoid hitting head on tree branches. Low branches should be cut throughout that section of trail to make it safer. Thank you.
Sidewalk on Smith is partially blocked by vegetation just south of this address
A tree branch fell onto the sidewalk. The entire tree at this point should probably be removed.
Sidewalk completely blocked by discarded road repair debris
Sidewalk coming up the hill from the goat farm on Winslow road tis frequently overgrown and hard to walk on. Brush between the street and sidewalk needs to be extensively cleaned out. Thanks!
Pretty significant hazard. The "Reverse angle only" parking sign has finally succumbed to the blow from a bad parker and is now lying across the sidewalk. It's still firmly enough attached to the base that it's not possible to pick it up and move it parallel to the curb. The other similar signs on the same block are also showing signs of fatigue
Conner of E Woodbine Ave and South Nota Dr. Sidewalk needs repaired and trees need to be trimmed. Tree limbs are low as 3 feet off the sidewalk. Pedestrians have to walk on the street (have to watch for traffic) or cut across their yard. Currently the city is repairing the sidewalks on E Covenanter Dr. (trees have rooted up) could the city also repair the sidewalk on South Nota and E. Woodbine Ave.? Thank you!
These crosswalk white lines need to be repainted
I think it is now more than three years since there have been proper crosswalks for pedestrians crossing Third Street at the Jordan Avenue intersection. It is more than two years since the first time I wrote to inquire about it (March 2016). I was told then that it would be done in the summer of 2016. I wrote again in early 2017, and was told it would be done in the spring of 2017. A friend of mine wrote in the summer of 2017 and was told it would be done in the fall. What the heck is going on? After the recent work at Third and Woodscrest, new crosswalks appeared immediately. For it to take years at a corner where the pedestrian traffic is much higher seems truly unconscionable.