closed #184725
Potholes, Other Street Repair
1211 W 6th ST
- Case Date:
- 7/22/2023
Major deterioration of city street pavement at entrance of paved alley, approximately 4” deep, causing hazardous driving condition.
Major deterioration of city street pavement at entrance of paved alley, approximately 4” deep, causing hazardous driving condition.
5th Street between Jefferson and Union streets is beyond the repair of simply fixing pot holes. Some of the damage on the street is due to property owners fixing their sewer lines and then not repaving the street.
While we do have a pothole at the edge of our driveway that extends into the culdesac and city street one which we live, I'm reporting here a request to extend the curb in the culdesac to the area in front of our house. I have sent in a few requests over the years to the City of Bloomington to get the curb extended and have never heard back. We regularly have folks parking in our yard (probably inadvertently), causing further erosion issues in our yard. Thank you.
The sewer cut for this new house was not properly compacted and the asphalt is subsiding.
In this area there's a lot of uneven road/semi potholes. Some have been filled some have not.
Pothole. Part of it was fixed but not all.
In the alley to the east of 305 N Washington St, there is a large hole in the road.
The part of Lindbergh between 15th and 17th that has been left unfinished for a few years is becoming more treacherous. Only one lane is passable, but it is a two-lane road. There are deep potholes along the road and there is plant growth that needs to be cut so that the northbound lane is useable when there is a car in the southbound lane. Please fix the issues asap.
Penn Court in Park Ridge East needs resurfacing. The road is falling apart and there are several potholes including one very large one in the cul-de-sac.
Lindbergh, between 11th St. and 17th St. has been left unfinished for years. It is a disaster to drive on, and the portion from 15th St to 17 St is basically a one-way lane as there isn't room for 2 cars using each lane. And now there is plant growth that is impeding the lane heading north to make the street even narrower. I see it is highlighted on the map of scheduled projects, but it isn't listed in the list for scheduled projects. It really feels like it has been forgotten. Please follow up on it and finish it.