open #208585
Sidewalk Snow Removal
3216 E 3rd ST
- Case Date:
- 2/10/2026
Bike lane still full of snow 2.5 weeks later. Along Clarizz, kingston, and Amp way.
Bike lane still full of snow 2.5 weeks later. Along Clarizz, kingston, and Amp way.
Snow has not been removed for almost half of the extent on the East Side of S Sare Rd from E Moores Pike to E Rodgers. Additionally, the removal on the West side of Sare is inadequate in many places, which could produce twisted ankles for pedestrians.
I’m reaching out regarding our driveway connecting to the street. The surface is extremely rough and there is a pretty big gap. It has gotten bad enough to the point it’s damaging the front bumper of my car when I back out. If someone could come out and take a look to repair it, that would be amazing. Thank you
West crosswalk on 3Rd st (where Madison crosses) is covered in snow. Snow berms blocking where the sidewalk meets the crosswalk. Crosswalks are always a pain point when it snows. Is it the city's responsibility or business'/residents' responsibility to clear adjacent sidewalk intersections? I spent a few hours clearing crosswalks downtown yesterday and I am too exhausted to do this one today.
The multiuse path on Sare Rd has not been cleared yet.
The walking path along South Rogers has not been cleared of snow at all. Between Patterson and Country Club. I know this is a major snow event and understand you are swamped, but this is a busy road and people cannot be walking in the street. Thank you.
The multi-use trail starting at Basswood and Bloomfield Rd and eastward up to Walker and 2nd St has not been cleared. I realize this may not be a priority, but I bike to work and until this trail is cleared, I need to ride on Bloomfield Rd/2nd St, greatly increasing my personal risk by having to share a road with motor vehicles. If possible to clear any or all of that trail, it would be greatly appreciated.
While redoing the Templeton elementary playground over the past year and a half many heavy construction vehicles used the two blocks of South Park Ave as their main access point for construction. During that time the road conditions on those two blocks of South Park ave (from Grimes to Hillside) have worsened becoming hazardous, with many potholes that need to be avoided like obstacles to dodge left and right. There are no sidewalks on this street so many kids walk to Templeton in the street, with the potholes creating further distraction for drivers. The construction crew hired was very respectful of the neighborhood, but the additional wear from the large project needs to be prioritized and addressed. Thank you for your time.
Pothole on south lane of 13th st at stop sign going east
Would it be possible to coordinate with county highway to windrow the snow from Curry Pike into open Green space on the east side of Curry instead of the West side into residential driveways? With 15 in we would have approximately 4 ft of snow in our driveways and the east side Green space for the church and Sentra could handle this much snow without having elderly people blocked in. I know this is a unique request given geographic location and the city county line. Thank you for your consideration. Best regards Matt