City Construction Projects
1205 1/2 S Rogers ST
- Case Date:
- 10/7/2025
Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.
Drainage or Runoff
2701 E Pine LN
- Case Date:
- 10/2/2025
The asphalt is coming up around the drain and frequently creates blockages that leaves and other debris easily stack on. Then the drain clogs and floods our driveway and mailbox area.
Drainage or Runoff
1340 E Sheridan DR
- Case Date:
- 6/11/2021
The stormwater drainage ditch (also known as "Sheridan Creek") near the intersection of Sheridan and Karen continues to erode with chunks of asphalt going into stormwater drains. This was looked at a couple of years ago with a decision of "careful watching." It seems like it is now time to re-pave the culvert or put in a drainage pipe, consistent with what is at both ends of this ditch.