Excessive Growth
321 N Maple ST
- Case Date:
- 9/17/2018
Vegetation is growing over the sidewalk on the Maple Street side of house. Sidewalk is impassible the entire length. You have to walk out in the street. Looks terrible and is a safety issue.
Excessive Growth
112 N Maple ST
- Case Date:
- 8/29/2022
Overgrowth at the stop sign. Covering a portion of the sidewalk. Intersection of 6th & Maple. The overgrowth is at south east corner of the intersection.
Sidewalk & Curb Complaints
800 W 6th ST
- Case Date:
- 9/1/2023
Vegetation overgrowth. Makes this sidewalk impassable because it's a sticker bush.
Blocked Sidewalk
1004 W 7th ST
- Case Date:
- 7/11/2023
The sidewalk at 1004 W 7th is completely blocked by overgrown vegetation
Blocked Street
720 W 7th ST
- Case Date:
- 8/26/2023
7th st (at intersection with maple) fully blocked by downed tree
Blocked Sidewalk
810 W 7th ST
- Case Date:
- 9/28/2022
Blocked sidewalk. The overgrowth from 810 W 7th is blocking the sidewalk along 7th street and partially blocking the alley entrance.
Excessive Growth
922 W 8th ST
- Case Date:
- 8/12/2023
A substantial tree limb grows
Across the sidewalk on the Maple street side of the property at about 5 1/2 above the ground. It’s a real hazard!!
Utilities Construction
719 W 7th ST
- Case Date:
- 12/15/2023
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.
Traffic Related Complaints
1231 W 7th ST
- Case Date:
- 3/22/2024
Between approximately 1910 until about 1925 on 3/21/24, I witnessed 6-8 vehicles drive south in the northbound lane in the construction area from Fountain then turning west on 7th St.
The vehicles ranged from a full-size truck pulling a trailor, the kind to haul a riding lawnmower, to an either 2-door or small 4-door car and judging from the high speed at which the car drove and the timing of the next northbound car, the southbound car entered the construction zone at the same time or after the northbound car entered from Kirkwood. This was all within 15-20 minutes on the 4th day of the closure.It's going to be a problem.
City Construction Projects
500 W 7th ST
- Case Date:
- 2/12/2024
Why there detour sign on seventh street