closed #187434
Blocked Sidewalk
2405 E Queens WAY
- Case Date:
- 2/26/2024
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bull dozer came through my drive way and damaged drive way and lawn.
The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.
So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
FINSISH THIS PRJECT