Excessive Growth
2809 S Somerset CT
- Case Date:
- 6/21/2023
Plants and trees overhang much of the sidewalk on the west side of S. Sare Rd. between Buttonwood and Rogers. The sidewalk is passable but more than half of it is blocked throughout parts of this path. Thank you!
Utility Construction Projects
2807 S Elizabeth CT
- Case Date:
- 3/25/2023
Gas? Workers dug up multiple parts of my lawn and driveway. This was two weeks ago. They said they were going to come back and fix everything but obviously that hasn’t happened. In the dirt is ground pieces of the old driveway including baseball sized chunks. We are also selling the house so this is hiring our home value - no one wants to buy a house with a broken chunk of driveway.
Traffic Suggestions
2801 S Rogers ST
- Case Date:
- 9/19/2024
Dedicated right turn lane at Country Club and Roger’s intersection for people heading eastbound
Traffic Related Complaints
2801 N Walnut St Suite 1
- Case Date:
- 8/6/2025
I cannot fathom why, every year, Bloomington literally decides to wait until the very first day of school to start a construction project on any main road leading to a school. Does that sound smart to you?? To ensure that all major roads leading to schools are down to one lane on the first day, almost certainly causing not only students to run late but parents late to work and likely more accidents??? Does that sound smart to yall?? It must because we’ve got construction on 10/bipass, bethel, and N walnut. Do. Better.
City Construction Projects
2801 E David DR
- Case Date:
- 12/17/2024
Metal sign near David & Sare leftover from project near Hyde park
- Case Date:
- 7/24/2024
This is an Envirosac of cement (concrete construction debris), likely left over from fiber optic installation one year ago. It is at the residence of 2809 E Daniel Street. It was a box of powdered cement, that naturally hardened into concrete, making it VERY heavy. I would like to know who to contact to remove this from the easement? Another neighbor asked the residents to please remove it, however they have not, and they likely do not think it is their place to do so since the fiber optic company fractured their driveway and did not take this box of cement with them when they repaired it.
Can you please point me in the right direction. Photos included. Thank you!
Blocked Sidewalk
2801 E Daniel ST
- Case Date:
- 9/9/2025
N/S running sidewalk on the east side of S Sare Rd is very overgrown, including poison ivy patches. This is a City-maintained path. Would be cool for it to be cut back!
Request a new Street Light
2800 W Arlington RD
- Case Date:
- 12/8/2022
in the morning and in the afternoon when school is starting/ending one can spend more than 10 minutes making a left turn here. Today I had one car ahead of me attempting this who eventually turned right after 11 minutes, while at least 5 school buses trying to get to Tri-North and a large number of cards piled up behind me. A stop sign or a light that is programed for school hours would make it a lot easier and help keep everyone arrive on time. An additional challenge is that you have a lot of new drivers (HS) who don't always use their turn signals or don't know to stop before turning on to Prow Rd and allow for taking turns.
Blocked Sidewalk
280 N Gates Dr, Bloomington, IN 47404, USA
- Case Date:
- 7/13/2022
The vegetation at the pinned location create an obstructed view and dangerous intersection for those turning from N jacobs onto Alexander
Blocked Street
2789 South Pinehurst Drive
- Case Date:
- 6/13/2018
Please unblock this road it is ridiculous I live at 2738 S Pinehurst Dr and I have to drive though some neighborhood to get to my house. If you are trying to stop people from going through my neighborhood you are failing because people will just go through more neighborhood to get around the construction and can you blame them you have completely shut the south side of town down and you are going to send all the Jehovah’s Witnesses though my neighborhood now since you cut off the only direct access to their church.