closed #192872
Biking & Walking
149 S Kingston Dr
- Case Date:
- 8/14/2024
New construction at the new sporting store has blocked the bicycle lane.
New construction at the new sporting store has blocked the bicycle lane.
Construction site at 3rd street and Pete Ellis has setup their construction fencing in the bike line along Pete Ellis. Was this intended and permitted?
The boulder that was installed at the corner of South Fess Avenue and the alley behind Bloomingfoods/The Elm has been moved into the sidewalk.
Bushes encroaching sidewalk directly behind Circle K on E. 3rd. 4405 E. 3rd. Intersection with Park Ridge Road. Bushes are on Park Ridge Road and makes cuthrough with wheelchair difficult with spring growth. Please have owner cut, or City.
Vegetation overgrowth on the west side of 6th St. between Morton and Madison Sts. The trees are less than 5'6" in some spots along the sidewalk. But the bushes are well into the middle of the sidewalk.
Bush blocking entire walkway. Also blocks ability for drivers pulling out of the alley to see people approaching the alley. Nearly got hit by homeowner from across alley from 717.
4301 e morningside. Branches obscure sidewalk being accessible
There are limited to no sidewalks on either side of the road leading up towards University Elementary School. Although the neighborhoods off Tamarron Drive and Keystone Court have sidewalks, the main thoroughfare doesn't. This makes it difficult--if not impossible--for persons to traverse the area regardless of disability status.
Tree needs trimmed. You can't walk down the sidewalk.
The road here is covered in a thick, sludgy gravel that is utterly inaccessible by wheelchair and difficult to traverse as an ambulatory person. This is in direct violation of the ADA as he wheelchair accessibility issue prevents the disabled from directly interacting with their community.